HSE Plan Health, Safety and Environment Revision Nr.: 1 Revision Date: xxx Document : HSE Plan Page 2 of 19 Table of Content 1. Introduction page 3 2. HSE Objectives page 4 3. EFG Scandinavia contractor management page 5 4. Overview of environmental management page 5 5. Environmental aspects page 7 6. Measures page 8… Continue reading HSE Plan (Health, Safety and Environment)
Month: November 2022
Undertaking Letter for Shoring works
Ref. No.: xxx/1021/DM/2022/02 Date: November 11, xxx To: xxx Municipality Department of Building and Development Dubai, UAE Project: Proposed Warehouses On Plot No. xxx at Al xxx, Dubai, UAE, for Heirs of Mr. xxx Client: xxx Subject: Undertaking Letter for Shoring works Dear Sir, We, xxx Building Contracting LLC, Consultant of the above-mentioned project… Continue reading Undertaking Letter for Shoring works
SUBCONTRACT AGREEMENT FOR DEWATERING WORKS
SUBCONTRACT AGREEMENT FOR DEWATERING WORKS AGREEMENT NO : XXX-P1016-SCA-DW-2021-02 AGREEMENT DATE : 17th November XXX PROJECT : Proposed Development Of Residential Villa (B+G+1+R) On Plot No. XXX, at XXX, Dubai, U.A.E. CLIENT : MR. XXX CONSULTANT : M/s. XXX CONSULTANTS This Subcontract Agreement is made effective on the date 17th November XXX BETWEEN M/s. XXX… Continue reading SUBCONTRACT AGREEMENT FOR DEWATERING WORKS
Appointment Letter for Dewatering works Subcontractor
REF: No. xxx/1016/SS-DOC/2021/01 Date: 08 December xxx xxx DEWATERING & LAND DRAINING CO. L.L.C. P.O. Box: xxx, Ras Al Khor, Dubai, UAE Project: Proposed Residential Villa (B+G+1+R) on Plat No. xxx, Palm Jumeirah– Dubai, UAE for Mr. xxx Subject: Appointment Letter for Dewatering works Subcontractor Dear Sir, With reference to the above subject, M/s xxx… Continue reading Appointment Letter for Dewatering works Subcontractor
Delay penalty due to failure to fulfil contractual obligations.
REF. No.: xxx/1016/SS-DOC/2022/2 Date: 31 October xxx xxx DEWATERING & LAND DRAINING CO. L.L.C. P.O. Box: 20782, Ras Al Khor, Dubai, UAE Project:Proposed Residential Villa (B+G+1+R) on Plat No. xxx, Palm Jumeirah– Dubai, UAE Client:Mr. xxx Subject: Delay penalty due to failure to fulfil contractual obligations. Dear Sir, We refer to the lump sum fixed… Continue reading Delay penalty due to failure to fulfil contractual obligations.
Re: Dewatering Works Delay Penalty
REF. No.: xxx/1016/SS-DOC/2022/03 Date: 1 November xxx xxx DEWATERING & LAND DRAINING CO. L.L.C. P.O. Box: xxx, Ras Al Khor, Dubai, UAE Project:Proposed Residential Villa (B+G+1+R) on Plat No. xxx, Palm Jumeirah– Dubai, UAE Client:Mr. xxx Subject: Re: Dewatering Works Delay Penalty Dear Mr. xxx, This is further to your letter ref. xxx/LR/JJ/J-8218-03/2022 dated 1st… Continue reading Re: Dewatering Works Delay Penalty
METHOD STATEMENT FOR UNDERGROUND DRAINAGE PIPING
METHOD STATEMENT FOR UNDERGROUND DRAINAGE PIPING TABLE OF CONTENTS 1.1. The objective of this method statement is to establish the necessary guidelines for the installation of underground drainage in accordance with the contract requirements. This method Statement shall ensure that the installation of underground drainage is executed safely and in accordance with the contract requirements.… Continue reading METHOD STATEMENT FOR UNDERGROUND DRAINAGE PIPING
RISK ASSESSMENT Underground Drainage Piping
RISK ASSESSMENT Underground Drainage Piping