AUDIO VISUAL SYSTEM

METHOD STATEMENT FOR Audio  Visual  System  INSTALLATION

METHOD STATEMENT FOR Audio  Visual  System  INSTALLATION TABLE OF CONTENTS 1. SCOPE 2. definitions 3. HEALTH  AND  SAFETY 4. OPERATION 5. installation  and  fixation 6. RESPONSIBILITIES 7. MANPOWER  REQUIRED 8. MATERIALS  REQUIREMENTS 9. EQUIPMENTs  REQUIREMENTs 10. WASTE  MANAGEMENT 11. SPECIAL  CONTROL  MEASURES 12. SUPPORTING  DOCUMENTATION 13. DISTRIBUTION 1. SCOPE This procedure to clear the method […]

METHOD STATEMENT FOR Audio  Visual  System  INSTALLATION Read Post »

ACCESS-CONTROL-SYSTEMS

METHOD STATEMENT FOR ACCESS CONTROL SYSTEM INSTALLATION

METHOD STATEMENT FOR ACCESS CONTROL SYSTEM INSTALLATION TABLE OF CONTENTS 1. SCOPE 2. definitions 3. HEALTH  AND  SAFETY 4. OPERATION 5. installation and fixation 6. RESPONSIBILITIES 7. MANPOWER  REQUIRED 8. MATERIALS  REQUIREMENTs 9. EQUIPMENTs  REQUIREMENTs 10. WASTE MANAGEMENT 11. SPECIAL CONTROL MEASURES 12. SUPPORTING  DOCUMENTATION 13. DISTRIBUTION 1. SCOPE This procedure to clear the method

METHOD STATEMENT FOR ACCESS CONTROL SYSTEM INSTALLATION Read Post »

Rebar on construction site

LETTER OF ACCEPTANCE (LOA) – Supply of deformed Steel Bars with cut & bend

Ref:       xxx/1020/LOA/SC/2022/02 Date:     24 August xxx To:         xxx Middle East Traders LLC                                 P.O. Box: xxx, Dubai- UAE. Phone: +xxx FAO:      Mr. xxx                                        Project: Residential Villa (G+1) & Service Block (R-9) Villa, On Plot No. xxx at Al Barari, – Dubai, UAE Subject: LETTER OF ACCEPTANCE (LOA) – Supply of

LETTER OF ACCEPTANCE (LOA) – Supply of deformed Steel Bars with cut & bend Read Post »

Engineering Submittals

Reply: Kick of Meeting (email)

Ref. xx/1020/AA/2021/01 Date: 29 November xx To:                       M/s. xxx ARCHITECTURAL & ENGINEERING CONSULTANCYOffice No. xxx, Sobha Ivory 2, Business Bay P.O. Box xxx, Dubai, UAE Attention:         Engr. xxx – Resident Engineer Project:              Proposed G+1 & Service Block (R-9) Villa, On Plot No. xxx at Al xxx – Dubai, UAE. Client:                Mr. xxx

Reply: Kick of Meeting (email) Read Post »

awaiting-response

withdrawal of our Submitted Project ref. MCM-1021-TS-GEN-04-00 dated 12th September xxx

Ref:       xxx/1021/A&B/2022/02 Date:     September 16, xxx To:         xxx Consulting  Architects  &  Engineers                                                              PO Box No.: xxx Dubai, UAE Phone: xxx                                                                            Project: Proposed Warehouses, on Plot No. xxx at Al Khabaisi, Dubai, UAE. Client:  xxx Subject: withdrawal of our Submitted Project ref. MCM-1021-TS-GEN-04-00 dated 12th September xxx. Dear Sir, With reference

withdrawal of our Submitted Project ref. MCM-1021-TS-GEN-04-00 dated 12th September xxx Read Post »

Critical Path

Project baseline programme and additional duration for variation works & testing and Commissioning

Ref:       MCM/1021/A&B/2022/03 Date:     xxx, xx To:         xxx Consulting  Architects  &  Engineers                                                              PO Box No.: xxx Dubai, UAE Phone: xxx                                                                           Project: Proposed Warehouses, on Plot No. xxx at Al Khabaisi, Dubai, UAE. Client:  xxx Subject: Project baseline programme and additional duration for variation works & testing and Commissioning. Dear Sir, With

Project baseline programme and additional duration for variation works & testing and Commissioning Read Post »

Demolition of existing watchman room

Demolition of existing watchman room

Ref: No. MCM/1015/ABC/2022/04 Date: xxx, 2022 To:         xxx Consulting  Architects  &  Engineers                                                              PO Box No.: xxx Dubai, UAE Phone: xxx                                                                            Project: Proposed Warehouses, on Plot No. xxx at Al Khabaisi, Dubai, UAE. Subject: Demolition of existing watchman room Dear Sir, With reference to the above subject, we would like to inform you

Demolition of existing watchman room Read Post »

Reply - Notice of Delay

Reply – Notice of Delay

Ref:       XXX/1021/A&B/2022/01 Date:     8 June XX To:         XXX Consulting  Architects  &  Engineers                                                              PO Box No.: XX Dubai, UAE Phone: XXX                                                                            Project: Proposed Warehouses On Plot No. xxx at xxx, Dubai, UAE. Subject: Re: Notice of Delay Dear Sir, In response to your letter ref. xxx-14 dated xxx 2022, we thank

Reply – Notice of Delay Read Post »