Bituminous-Membrane-Waterproofing

Method Statement for Placing of Surface Protection Material

CONTENTS 1.0 Purpose 2.0 Scope of Work 3.0 Definitions 4.0 References 5.0 Materials 6.0 Tools, Plant & Equipment 7.0 Safety 8.0 Prior Activities 9.0 Procedure 10.0 Responsibilities 11.0 Attachments 1.0 Purpose 1.1 To ensure that placing of surface protection material and related activities are executed safely and in accordance with the contract requirements and that […]

Method Statement for Placing of Surface Protection Material Read Post »

JOB HAZARD ANALYSIS TOOLBOX TALKS ATTACHMENTS Casting Blinding Concrete for Foundation Building Structures

JOB HAZARD ANALYSIS TOOLBOX TALKS ATTACHMENTS Backfilling of Building Structures

Toolbox talks:-Manual HandlingCOSHHNOISE Manual Handling We lift, manoeuvre and handle goods every day of our lives in one way or another, not just whilst at work but also during social activities such as gardening, DIY, shopping and sport. A bad back or injury today, could, and regularly does, turn into a painful back problem for

JOB HAZARD ANALYSIS TOOLBOX TALKS ATTACHMENTS Backfilling of Building Structures Read Post »

ACTIVITY HAZARD ANALYSIS Construction of Cast-in-Situ Concrete for Building structure

Method Statement for Backfilling of Building Structures

TABLE OF CONTENTS Purpose Scope of Work Definitions References Materials Tools, Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments Purpose 1.1       To ensure that the backfilling of building structures is executed safely and in accordance with the contract requirements and that all quality assurance/ control activities are conducted in a systematic manner, works are

Method Statement for Backfilling of Building Structures Read Post »

Risk Assessment Procedure Step wise Guide

ACTIVITY HAZARD ANALYSIS Backfilling of Building Structures

HAZARD / WORK: Backfilling of Building Structures LOCATION:______________________________________________ H=High                        M=Medium                   L=Low                                Significant Risks H M L   Who May Be Harmed 1 Work related upper limb disorders. Musculoskeletal injuries. Cuts, abrasions. Foot / toe injuries     X       2 Dehydration, heat exhaustion. Heat stroke     X   Employees…………………… X 3 Cuts,

ACTIVITY HAZARD ANALYSIS Backfilling of Building Structures Read Post »

JOB HAZARD ANALYSIS TOOLBOX TALKS ATTACHMENTS Casting Blinding Concrete for Foundation Building Structures

JOB HAZARD ANALYSIS TOOLBOX TALKS ATTACHMENTS of North Stormwater Retention Pond and Overtopping Spillway

Toolbox talks:-Manual HandlingCOSHHNOISE Manual Handling We lift, manoeuvre and handle goods every day of our lives in one way or another, not just whilst at work but also during social activities such as gardening, DIY, shopping and sport. A bad back or injury today, could, and regularly does, turn into a painful back problem for

JOB HAZARD ANALYSIS TOOLBOX TALKS ATTACHMENTS of North Stormwater Retention Pond and Overtopping Spillway Read Post »

ACTIVITY HAZARD ANALYSIS Construction of North Stormwater Retention Pond and Overtopping Spillway

Method Statement for Construction of North Stormwater Retention Pond and Overtopping Spillway

CONTENTS Purpose Scope of Work Definitions References Materials Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments Purpose 1.1       To ensure that the North Stormwater Retention Pond and Overtopping Spillway are executed safely and in accordance with the contract requirements and that all quality assurance/ control activities are conducted in a systematic manner, works are

Method Statement for Construction of North Stormwater Retention Pond and Overtopping Spillway Read Post »

ACTIVITY HAZARD ANALYSIS Construction of North Stormwater Retention Pond and Overtopping Spillway

JOB HAZARD ANALYSIS Construction of North Stormwater Retention Pond and Overtopping Spillway

  TASK: ­­­­­­­­ Construction of North Stormwater Retention Pond and Overtopping Spillway     Date: 06 November 2006 No ACTIVITY HAZARD RISK CONTROL MEASURES TO MINIMISE / ELIMINATE RISK RESPONSIBLE PERSON 1 Service location survey Manual handling operations (MHO’s) Work related upper limb disorders. Musculoskeletal injuries. Cuts, abrasions. Foot / toe injuries Maximum use of

JOB HAZARD ANALYSIS Construction of North Stormwater Retention Pond and Overtopping Spillway Read Post »

ACTIVITY HAZARD ANALYSIS Construction of North Stormwater Retention Pond and Overtopping Spillway

ACTIVITY HAZARD ANALYSIS Construction of North Stormwater Retention Pond and Overtopping Spillway

HAZARD / WORK:       Construction of North Stormwater Retention Pond and Overtopping Spillway LOCATION:                                                                                                  H=High                        M=Medium                   L=Low                                Significant Risks H M L   Who May Be Harmed 1 Work related upper limb disorders. Musculoskeletal injuries. Cuts, abrasions. Foot / toe injuries     X       2 Dehydration, heat exhaustion. Heat stroke  

ACTIVITY HAZARD ANALYSIS Construction of North Stormwater Retention Pond and Overtopping Spillway Read Post »

JOB HAZARD ANALYSIS TOOLBOX TALKS ATTACHMENTS Casting Blinding Concrete for Foundation Building Structures

JOB HAZARD ANALYSIS TOOLBOX TALKS ATTACHMENTS for Backfilling of Precast Units

Toolbox talks:-Manual HandlingCOSHHExcavationsNOISE Manual Handling We lift, manoeuvre and handle goods every day of our lives in one way or another, not just whilst at work but also during social activities such as gardening, DIY, shopping and sport. A bad back or injury today, could, and regularly does, turn into a painful back problem for

JOB HAZARD ANALYSIS TOOLBOX TALKS ATTACHMENTS for Backfilling of Precast Units Read Post »