Final Submission of Variation Order No. 6A R1

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject        : Final Submission of Variation Order No. 6A R1 – Change in Stag Bar Door Location after complying with comments in document ref: xxx Dear Sir, With reference to above and document […]

Rejection of Lift Lobby Shop Drawing for Tile at Typical Floor

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject        : Regarding rejection of Lift Lobby Shop Drawing for Tile at Typical Floor and Additional Instruction by ID Dear Sir, With reference to our submission ref. xxx date xxx which was responded […]

Improper tile ratio supplied for pool deck area

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject        : Regarding improper tile ratio supplied for pool deck area( shortage of NEOSTONE AVORIO GRIPM 333X333) Dear Sir, With reference to above there is shortage of the tile named NEOSTONE AVORIO GRIPM […]

Reminder for BOH Threshold and Vanity Counter Nomination

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject        : Reminder for BOH Threshold and Vanity Counter Nomination for Remaining Area Dear Sir, With reference above subject, we would like to inform you that we are following since long time for […]

Reply – renewal of CAR insurance, your ref no. xxx dated xxx

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject        : Regarding your letter renewal of CAR insurance, your ref no. xxx dated xxx Dear Sir, With reference above, we would like to inform you that CAR insurance renewal was completed today […]

Variation for additional column and block wall at main entrance area in Ground Floor.

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject        : Variation for additional column and block wall at main entrance area in Ground Floor. Dear Sir, With reference to above subject we would like to submit variation at entrance area in […]

NCR for roof water proofing system and approved materials

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject        : Regarding NCR for roof water proofing system and approved materials                       And re-confirmation / undertaking Dear Sir, With reference to the above mentioned subject, we are hereby stating that all […]

14th floor toilet and ablution tile

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject       : 14th floor toilet and ablution tile Dear Sir, With reference to the above, we would like to inform you that we followed continuously to provide tile for 14th floor toilet and […]

Delay in approval of Steel Structure and additional cost

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject       : Regarding the delay in approval of Steel Structure and additional cost of                       Mobile crane since we are removing the tower crane Dear Sir, With reference with the above mentioned […]

Reply – slow progress Of work and resources issue

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject       : Regarding your mail dated xxx, regarding slow progress                   Of work and resources issue Dear Sir,                With reference to your above mail (copy attached) we would like to intimate […]