Regarding Non submission of technical details and samples of materials and accessories

Date                : xxx Ref                   : xxx To                    : M/s. xxx GROUP, PO Box xxx, Sharjah UAE. Project             : 2B + G + 14 + Lower Roof Hotels Building on Plot No. xxx at Barsha, Dubai Subject            : Regarding Non submission of technical details and samples of materials and accessories Dear Mr. Dhruv, With reference […]

Regarding Non submission of technical details and samples of materials and accessories Read Post »

False ceiling work

Regarding your construction site inspection report on xxx

Date: xxx Ref no: xxx To The Manager, DM Qualification Section (License) Dubai Municipality, Dubai UAE Sub              : Regarding your construction site inspection report on xxx Dear Sir, As per your site visit and inspection on xxx for products covered by DM regulations LO (44)1990, Circular (159) 2007, Circular (132)2005, Circular (183) 2011, we approved

Regarding your construction site inspection report on xxx Read Post »

Undertaking letter

Application no xxx- Undertaking letter

Date: xxx Ref no: xxx To The Manager, DM Qualification Section (License) Dubai Municipality, Dubai UAE Sub              : Application no xxx- Undertaking letter Dear Sir,           “This is in reference to the DM application no xxx . We undertake any damage to the existing beams for connections to Steel structure is our responsibility” xxx (Managing

Application no xxx- Undertaking letter Read Post »

Undertaking letter

Undertaking for the construction joint for the pool construction

Date: xxx Ref no: xxx To The Manager, DM Qualification Section (License) Dubai Municipality, Dubai UAE Sub             : Undertaking for the construction joint for the pool construction at LB-102 for pool slab and method statement. Dear Sir, With reference to the above, we are hereby undertaking that we will follow the method statement at construction

Undertaking for the construction joint for the pool construction Read Post »

Undertaking letter

Undertaking for law height form work for slab above ettic slab (0.7m   height) and pool deck

Date: xxx Ref no: xxx To The Manager, DM Qualification Section (License) Dubai Municipality, Dubai UAE Sub               : Undertaking for law height form work for slab above ettic slab (0.7m   height) and pool deck. Dear Sir, With reference to the above, we are hereby undertaking that our formwork for 0.7m height slab above ettic slab

Undertaking for law height form work for slab above ettic slab (0.7m   height) and pool deck Read Post »

Shop Drawing

Submission of the proposal to close the distribution pump opening in PT slab

Date: xxx Ref no: xxx To The Manager, DM Qualification Section (License) Dubai Municipality, Dubai UAE Sub                : Submission of the proposal to close the distribution pump opening in PT slab from 4th floor to roof located in corridor Dear Sir, With reference to the above, we are hereby submitting the proposal and approval by

Submission of the proposal to close the distribution pump opening in PT slab Read Post »

Undertaking letter

Undertaking letter by Main contractor for structural safety /building safety as  required in application no:xxx.

Date: xxx Ref no: xxx To The Manager, DM Qualification Section (License) Dubai Municipality, Dubai UAE Sub      :  Undertaking letter by Main contractor for structural safety /building    safety as  required in application no:xxx. Dear Sir, With reference to the above, we the main contractor M/s xxx contracting LLC , PO Box:xxx, Tel: 04-xxx,  are confirming

Undertaking letter by Main contractor for structural safety /building safety as  required in application no:xxx. Read Post »

shake-up-sales-meeting

Engineers are ready for training required for xxx Contracting L.L.C License no: xxx

Date: xxx Ref no: xxx To The Manager, DM Qualification Section (License) Dubai Municipality, Dubai UAE Sub:  Engineers are ready for training required for xxx Contracting L.L.C License no: xxx Dear Sir, With ref. to above and requirement our engineers are ready to take the training immediately with your appointment. So, kindly provide immediate appointment

Engineers are ready for training required for xxx Contracting L.L.C License no: xxx Read Post »