METHOD STATEMENT FOR UN-EVEN SURFACE AT RETAINING WALL VERTICAL CONSTRUCTION JOINT

Purpose of work: It describes the methodology for the execution for the un-even surface at Retaining Wall Vertical Joint. EXECUTION FOR SURFACE PREPARATIONAll loose materials should be removed from the surface by manually chipping of excess concrete until it reached the minimum thickness and by gradual mechanical abrading until it achieved and reached the same surface alignment of previous casted […]

METHOD STATEMENT FOR GYPSUM CEILING WORK

              CONTENTS     SCOPE OF WORK     SUBMITTALS     SITE INSTALLATION WORKS     FRAME WORK INSPECTION, MEP CLEARNCE & CLOSURE   FINISHING GYPSUM BOARD ASSEMBLIES   FINAL CHECK UP AND HANDING OVER     SNAGGING / DESNAGGING   SCOPE OF WORK Supply and installation of Gypsum ceiling all in accordance with specification, contract documents & […]