What does it mean by As Built drawing in construction industry.

What does it mean by As Built drawing in construction industry.

In the construction industry, an As-Built drawing (also known as “Record Drawing”) refers to the final set of drawings that represent the completed project as it was actually built on site. These drawings are critical for documenting any changes, modifications, or deviations that occurred during the construction process compared to the original design or construction drawings.

Understanding As-Built Drawings

As-Built drawings are produced after the construction phase is complete and reflect the exact dimensions, locations, and specifications of the structure as it was constructed. They capture the reality of the finished product, including all the modifications that were made during construction, whether due to unforeseen site conditions, changes in materials, or design alterations requested by the client or required for compliance with regulations.

Importance of As-Built Drawings

  1. Accurate Record of the Project:
  • As-Built drawings provide an accurate record of what was actually constructed, including any changes made during the construction process. This record is invaluable for future maintenance, renovations, or expansions.
  1. Legal Documentation:
  • These drawings serve as a legal document, demonstrating that the project was completed according to the approved design and specifications, albeit with documented changes. They are often required for obtaining occupancy permits and other regulatory approvals.
  1. Maintenance and Facility Management:
  • Building owners and facility managers rely on As-Built drawings to understand the layout and systems within the building. This information is crucial for ongoing maintenance, repairs, and system upgrades.
  1. Reference for Future Projects:
  • As-Built drawings serve as a reference point for any future construction projects on the same site, whether it involves renovations, additions, or modifications. They help avoid conflicts with existing structures and systems.
  1. Clarity and Transparency:
  • By documenting all changes, As-Built drawings provide clarity and transparency about what was built. This helps in resolving any disputes or discrepancies that may arise during or after the construction phase.

Key Components of As-Built Drawings

As-Built drawings typically include the following key components:

  1. Dimensional Changes:
  • Any changes in dimensions from the original design, such as adjusted wall locations, column placements, or ceiling heights, are documented in the As-Built drawings.
  1. Location of Systems and Components:
  • The exact locations of mechanical, electrical, plumbing (MEP), and structural components are recorded, including any adjustments made during installation. This includes changes to ductwork, piping, electrical wiring, and other building systems.
  1. Material Substitutions:
  • If any materials were substituted during construction (e.g., a different type of insulation, flooring, or finishes), these changes are noted in the As-Built drawings.
  1. Revised Layouts:
  • Any changes to the layout of rooms, doors, windows, or other architectural elements are documented. This ensures that the final layout reflects what was actually constructed.
  1. Hidden Elements:
  • As-Built drawings often document hidden elements, such as buried utilities, foundation details, or concealed wiring, which are not visible in the completed structure but are crucial for future work.
  1. Structural Modifications:
  • Any changes to the structural elements of the building, such as the addition of beams, columns, or other supports, are recorded.
  1. Annotation and Notes:
  • The drawings are annotated with notes explaining the reasons for changes, providing context for why modifications were made. This can include notes on field conditions, unforeseen obstacles, or client requests.

Process of Creating As-Built Drawings

The process of creating As-Built drawings involves several steps:

  1. Ongoing Documentation:
  • During construction, the contractor is responsible for marking up the original construction drawings with any changes made on-site. This is often done in real-time to ensure accuracy and completeness.
  1. Review and Verification:
  • Once construction is complete, the contractor reviews the marked-up drawings, verifying that all changes have been accurately recorded. This may involve cross-checking against site measurements or field notes.
  1. Final Drafting:
  • The marked-up drawings are then redrafted to create the final As-Built drawings. This can be done manually or using computer-aided design (CAD) software, ensuring that all changes are clearly and accurately represented.
  1. Submission for Approval:
  • The final As-Built drawings are submitted to the project owner, architect, and other relevant parties for approval. In some cases, they may also need to be submitted to local authorities or regulatory bodies.
  1. Archiving and Distribution:
  • Once approved, the As-Built drawings are archived as part of the project’s permanent records. Copies are distributed to the building owner, facility managers, and any other relevant stakeholders.

Types of As-Built Drawings

As-Built drawings can be created for various aspects of a construction project, including:

  1. Architectural As-Builts:
  • These include floor plans, elevations, sections, and details that reflect the final layout and design of the building.
  1. Structural As-Builts:
  • Drawings that document the as-built condition of the structural framework, including any modifications to beams, columns, foundations, and load-bearing walls.
  1. MEP As-Builts:
  • Mechanical, Electrical, and Plumbing As-Builts detail the final installation of HVAC systems, electrical wiring, lighting, plumbing, and fire protection systems.
  1. Civil As-Builts:
  • For projects involving significant site work, civil As-Builts document the final grading, drainage, utilities, roads, and other site-related elements.
  1. Interior Design As-Builts:
  • These drawings capture the final finishes, fixtures, furniture, and other interior elements, including any changes made during construction.

Challenges in Creating As-Built Drawings

Creating accurate As-Built drawings can present several challenges:

  1. Incomplete Documentation:
  • If changes are not thoroughly documented during construction, creating accurate As-Built drawings becomes difficult. Incomplete or missing records can lead to discrepancies.
  1. Complexity of Changes:
  • Large projects with numerous changes can make it challenging to track and document every modification accurately.
  1. Coordination Across Trades:
  • Coordinating the As-Built information from various trades (e.g., electrical, plumbing, structural) requires careful management to ensure that all changes are captured.
  1. Field Conditions:
  • In some cases, changes may be made in response to unforeseen site conditions, which can be difficult to document accurately after the fact.

Conclusion

As-Built drawings are an essential component of the construction process, providing a detailed and accurate record of what was actually built. They are crucial for the long-term management, maintenance, and potential future modification of the building or infrastructure. By accurately reflecting the final, built condition, As-Built drawings ensure that all stakeholders have a clear and reliable reference for the completed project.

Leave a Reply

Your email address will not be published. Required fields are marked *