METHOD STATEMENT FOR UN-EVEN SURFACE AT RETAINING WALL VERTICAL CONSTRUCTION JOINT

Purpose of work: It describes the methodology for the execution for the un-even surface at Retaining Wall Vertical Joint. EXECUTION FOR SURFACE PREPARATIONAll loose materials should be removed from the surface by manually chipping of excess concrete until it reached the minimum thickness and by gradual mechanical abrading until it achieved and reached the same […]