Regarding Confirmation for concrete strength and durability due to change of the slump value to 200+- 25mm and 2 hour pouring time

Date:               20.11.2016 Ref:                  To                   : Project           : 2B + G + 14+ Lower Roof Hotels Building on Plot No. 373-1297 at Barsha, Dubai Subject          : Regarding Confirmation for concrete strength and door ability due to change of the slump value to 200+- 25mm and 2 hour pouring time Dear Sir, With reference to the above, we are hereby […]