Nomination of metal door and discrepancy at 14th floor

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject            : Nomination of metal door and discrepancy at 14th floor due to change in the   drawing. Dear Sir, With reference to the above, we reviewed the nomination […]

Nomination of metal door and discrepancy at 14th floor Read Post ยป