Method Statement Title: Testing of Lightning Protection System

Method Statement Title: Testing of Lightning Protection System 1.0       Scope 1.1       Testing of Lightning protection system in accordance with the requirements of                       Specification 16950. 2.0       Material 3.0       Method 3.1       Testing equipment   4.1.1    Earth tester.  4.1.2    Continuity tester.                          The calibration certificates of testing instruments will be verified for validity                        prior to use. […]

Method Statement Title: Testing of Lightning Protection System Read Post »