Method Statement Title: Testing and Commissioning of Fire Alarm System

Method Statement Title: Testing and Commissioning of Fire Alarm System 1.0       Scope This method statement details the method of Testing and commissioning of  Fire Alarm  System, as per Project Specification 16721             Note             A separate Method Statement Ref. ETA/MS/E- 018 shall be submitted for Installation of  the Fire Alarm System. 2.0       Material 2.3       Type […]

Method Statement Title: Testing and Commissioning of Fire Alarm System Read Post »