Method Statement Title: Testing and commissioning of Door Entry System
1.0 Scope This method statement details the method of Testing and commissioning of Door Entry System. Note 1) A separate Method Statement Ref. ETA/MS/E- 019 shall be submitted for Installation of the CCTV System. 2) A separate Method Statement Ref. ETA/MS/E- 020 shall be submitted for Installation of the Access Control System. 3) A […]
Method Statement Title: Testing and commissioning of Door Entry System Read Post ยป
