Method Statement Title: Installation, Testing and Commissioning of Sub Main Distribution Boards (SMDB’s)
1.0 Scope 2.0 Material 3.0 Applicable Location 4.0 Method 4.1 Storage 4.2 Installation 5.0 Testing & Commissioning: 5.1 Instruments. Note : The instruments used for testing and commissioning shall be checked and ensured that they are calibrated and the current valid calibration reports are filed for record. 5.2 Method 6.0 Safety 6.1 […]
