Method Statement Title: Installation of pressurization Fans
Method Statement Title: Installation of pressurization Fans 1.0 Scope 3.2 Threaded rods, fasteners for supports. 3.3 Duct flexible connections. 3.4 Electrical cables, controls and accessories. BMS interfacing shall be done as defined in Material Submittal No.NMX/BDR/4045/GEN/CD/10809 dated 10.10.04 (ETA 024, Rev.3) 8.2 Signed off Fan’s installation checklist. 9.1 Installation check list for Pressurisation Fans.
Method Statement Title: Installation of pressurization Fans Read Post »
