Method Statement Title: Installation of HVAC Ductwork

Method Statement Title: Installation of HVAC Ductwork 1.0       Scope : 2.0       Purpose : 4.0       Material : 5.0       Method : 5.1       Storage Preparation for the traverse joints including the fixing of the flanges/profiles as applicable as per the construction schedule is carried out at workshop. Please refer attached Annexure-II (revised) 6.0       Installation : […]

Method Statement Title: Installation of HVAC Ductwork Read Post »