Method Statement Title: Installation of Exhaust Fans (Parking Area)
Method Statement Title: Installation of Exhaust Fans (Parking Area) Scope 3.2 Threaded rods, fasteners for supports. 3.3 Duct flexible connections. 4.5 Electrical connections 4.5.1 Electrical power connections shall be done as per approved drawings. 4.6 BMS Interfacing BMS interfacing as defined in Material Submittal No.NMX/BDR/4045/GEN/CD/10809 dated 10.10.04 (ETA M-024, Rev.3) 8.2 Signed off Fan’s installation […]
Method Statement Title: Installation of Exhaust Fans (Parking Area) Read Post »
