Method Statement Title: Installation of Bus Duct System.

1.0       Scope Note : A separate Method Statement ref. ETA/MS/E-32 shall be submitted for Testing & Commissioning. 2.0       Material 3.0       Applicable Location 4.0       Method 4.1       Storage   7.0       Records 8.0       Attachment 8.1       Inspection Check List for Installation of Enclosed Bus Assemblies

Method Statement Title: Installation of Bus Duct System. Read Post »