Method Statement Title: Installation and testing of Chilled Water Piping

Method Statement Title: Installation and testing of Chilled Water Piping 1.0       Scope : 2.0       Purpose : 3.0       Material : ERW, black steel, SCH 40, Grade ‘B’  Upto 50mm dia. MI fittings, Black, threaded ends 65mm dia and above – Steel Butt welding type/Grooved coupling joint type.    Upto 50mm                 :           Threaded ends 65mm […]

Method Statement Title: Installation and testing of Chilled Water Piping Read Post »