METHOD STATEMENT FOR THE RAFT CONCRETE for the GENERAL AREA ( A2)including VERTICAL WALL AT PUMP ROOM/ WATER TANK AREA
Purpose of WorkThis work procedure describes the method to be adopted for Basement Raft concreting work for the General Area as shown in the drawings and as directed by the engineer in charge. Reference Contract Specification.o C40/20 OPC (120kg)+70% GGBS(280KG) Applicable drawings.o DM Approved drawing Equipment’s Required Concrete Placer Pump with 48m arm length -01 […]
