Method Statement for Sub-Surface Deglottalization of Infrastructure

CONTENTS Purpose Scope of Work Definitions References Materials Tools, Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments Purpose 1.1       To ensure that the sub-surface delethalisation of all infrastructure within the graded portion of the runway strip that constitutes a buried upstand less than 400mm below ground level is executed safely and in accordance with […]

Method Statement for Sub-Surface Deglottalization of Infrastructure Read Post »