Method Statement for Production of As-Built Drawings
As-built drawings are the most important documents in the construction process. As-built drawings are usually the original design drawings revised to reflect any changes made in the field (e.g., design changes issued by change order and/or RFI, component relocations required for coordination, and rerouting of distribution systems). All of these revisions will need prior approval […]
Method Statement for Production of As-Built Drawings Read Post ยป
