Method Statement for Placing of Surface Protection Material

Bituminous-Membrane-Waterproofing

Method Statement for Placing of Surface Protection Material

CONTENTS Purpose Scope of Work Definitions References Materials Tools, Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments 1.0       Purpose To ensure that placing of surface protection material and related activities are executed safely and in accordance with the contract requirements and that all quality assurance/control activities are conducted in a systematic manner, works are […]

Method Statement for Placing of Surface Protection Material Read Post »

Bituminous-Membrane-Waterproofing

Method Statement for Placing of Surface Protection Material

CONTENTS 1.0 Purpose 2.0 Scope of Work 3.0 Definitions 4.0 References 5.0 Materials 6.0 Tools, Plant & Equipment 7.0 Safety 8.0 Prior Activities 9.0 Procedure 10.0 Responsibilities 11.0 Attachments 1.0 Purpose 1.1 To ensure that placing of surface protection material and related activities are executed safely and in accordance with the contract requirements and that

Method Statement for Placing of Surface Protection Material Read Post »