METHOD STATEMENT FOR INSTALLATION TESTING AND COMMISSIONING OF SMOKE MANAGEMENT SYSTEM

CONTENTS 1.0      PURPOSE 2.0      SCOPE 3.0      REFERENCES 4.0      DEFINITIONS 5.0      RESPONSIBILITIES 6.0      EQUIPMENT & MATERIALS 7.0      PROCEDURE 8.0      ATTACHMENTS   1.0 PURPOSE This method statement is applicable for the sequence & Methodology that will be used for the Installation, testing and commissioning of Smoke Management System as mentioned in the Specifications & Approved Shop Drawings. […]

METHOD STATEMENT FOR INSTALLATION TESTING AND COMMISSIONING OF SMOKE MANAGEMENT SYSTEM Read Post »