METHOD STATEMENT FOR INSTALLATION AND TESTING OF DOMESTIC COLD / HOT WATER SUPPLY PIPING AND ACCESSORIES

CONTENTS 1.0 PURPOSE 2.0 SCOPE 3.0  REFERENCES 4.0  DEFINITIONS 5.0  RESPONSIBILITIES 6.0  EQUIPMENT 7.0  PROCEDURE 8.0 ATTACHMENTS 1.0 PURPOSE This method statement is applicable for Installation & testing of Domestic Cold and Hot water supply Piping system and its accessories ( Above & Below Ground) in all areas for the project. 2.0 SCOPE Supply , […]

METHOD STATEMENT FOR INSTALLATION AND TESTING OF DOMESTIC COLD / HOT WATER SUPPLY PIPING AND ACCESSORIES Read Post »