Guide line for surveyor work

Date: xxx CC/SITE/07/16 Kind Attn:          Land surveyor Project:             2B + G + 14 + Lower Roof Hotel Building Plot No.:            373-1297 at Barsha, Dubai Subject:           Guide line for surveyor work Dear Surveyor, Kindly note the following: Surveyor must report at the site to PM –Mr. xxx where all the level of points are to marked for that will be […]