confirmation from the lift contractor for the delivery of the material

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject      :    Regarding confirmation from the lift contractor for the delivery of the material                         and invoice  raised  for major equipment delivery(75% of material cost). Dear Sir With reference to the above, as […]