Sale!

Construction Documentation for Villa with Rooftop Pool |

Rated 5.00 out of 5 based on 2 customer ratings
(2 customer reviews)

Original price was: 40,00 $.Current price is: 15,00 $.

Complete Villa Rooftop Pool construction handbook. 16-month Primavera P6 .xer with cost-loaded activities, S-curve, manpower histogram, waterproofing MEP coordination. Instant digital download.

Guaranteed Safe Checkout

Villa Rooftop Pool Construction Handbook

This professional construction handbook delivers a detailed L4 baseline schedule with cost, manpower, and plant & equipment fully loaded for a Basement, Ground, First, Second and Roof Floor Villa with Rooftop Swimming Pool. The 16-month programme (including 1-month mobilization) follows logical construction sequence with comprehensive WBS structure.

Package Contents

  • Primavera P6 Programme (.xer) — 16-month resources loaded baseline schedule with cost, manpower, and equipment
  • S-Curve & Cash Flow — Professional format with cumulative cost and progress curves
  • Manpower Histogram — Trade-wise resource loading with peak demand analysis
  • Plant & Equipment Schedule — Equipment utilization across project timeline
  • Month-wise Activity & KPIs — MS Excel with major milestones and performance indicators

High-Level WBS Structure

WBS Level Scope
1.0 Pre-Commencement: LOA, Contract, NOC, Approved Drawings, Commencement Letter
2.0 Engineering Submissions & Approvals (Subcontractor Pre-qual, PS/PC Items, Materials, Shop Drawings)
3.0 Engineering Procurement (Civil & MEP Long Lead Items)
4.0 Construction Works: Substructure, Superstructure, Finishes (Internal/External)
5.0 MEP Works: Power & Lighting, ELV/Home Automation, Water Supply, Drainage, HVAC, Fire Systems
6.0 Completion: Substantial Completion, Authority Approval, Snagging, Testing & Commissioning
7.0 Handover to Client

Key Features

  • 16-Month Duration: Including 1-month mobilization period
  • Cost-Loaded: Every activity linked to BOQ items with cost breakdown
  • Manpower-Loaded: Trade-wise histograms showing peak workforce requirements
  • Equipment-Loaded: Plant & machinery utilization schedules
  • Rooftop Pool Integration: Specialized waterproofing and MEP coordination
  • L4 Detail: Granular activities suitable for monthly progress reporting
  • Primavera .xer Format: Import-ready for P6, compatible with progress updating

Who Needs This Handbook

  • Planning Engineers preparing baseline submissions for luxury villas with rooftop pools
  • Project Managers tracking cost & resource performance
  • Quantity Surveyors validating cash flow forecasts
  • Contractors bidding villa projects with rooftop pools
  • Consultants reviewing contractor programmes

Related Construction Programme Resources

Instant Digital Download

Upon purchase, receive immediate access to .xer Primavera file, Excel KPIs, and PDF documentation. No shipping, no waiting.


Part of the Engineers Blog Construction Programme Series. Used on GCC villa projects since 2022.

2 reviews for Construction Documentation for Villa with Rooftop Pool |

  1. Rated 5 out of 5

    Ahmed K. (verified owner)

    Excellent quality template, very professional and well-structured.

  2. Rated 5 out of 5

    Mohammed S. (verified owner)

    Great document, saved me a lot of time on my project.

Add a review

Your email address will not be published. Required fields are marked *

Construction handbook villa rooftop pool - Primavera P6 .xer 16-month cost-loaded schedule with S-curve manpowerConstruction Documentation for Villa with Rooftop Pool |
Original price was: 40,00 $.Current price is: 15,00 $.
Scroll to Top