Sale!

Technical Guide for Joinery Works Installation Manual

Rated 5.00 out of 5 based on 2 customer ratings
(3 customer reviews)

Original price was: 25,00 $.Current price is: 6,00 $.

Method Statement and Installation of Joinery Works in professional printed format.

Guaranteed Safe Checkout
Table of Contents
S#
Page No.
1 Scope 2
2 References 2
3 General 2
4 Resources 2
5 Personnel as per Organizational Chart 3
6 Definitions & Abbreviation 3
7 Procedures and Installation
7.1 Doors
7.2 Wall Paper
7.3 False Ceiling
7.4 Tiles
7.5 Carpet
7.6 Cabinet
7.7 Wall paper 3
3-4
5
6
7-10
10
11
12-13
8 Quality 14
9 Safety 14
10 Storage 14
11Attachments
Appendix 1:  Risk Assessment for Timber Door Frames and Door
Appendix 2:  Inspection and Test Plan for Timber Door Frames and Door
Appendix 3:  Method of Rectification  of Doors and Vanity Units
Weight 0,5 kg
Dimensions 30 × 22 × 3 cm

3 reviews for Technical Guide for Joinery Works Installation Manual

  1. Rated 5 out of 5

    Ahmed K. (verified owner)

    Excellent quality template, very professional and well-structured.

  2. Rated 5 out of 5

    Mohammed S. (verified owner)

    Great document, saved me a lot of time on my project.

  3. Rated 4 out of 5

    John D. (verified owner)

    Very comprehensive and easy to customize. Highly recommended.

Add a review

Your email address will not be published. Required fields are marked *

Method of Statement Joinery WorkTechnical Guide for Joinery Works Installation Manual
Original price was: 25,00 $.Current price is: 6,00 $.
Scroll to Top