Extension of time claims and computation of prolongation cost to complete the construction project with Narration in professional printed format and Primavera professional format. Time Impact analysis technique used to determine the delay.
EOT Claims & Prolongation Cost Computation Guide
Original price was: 35,00 $.15,00 $Current price is: 15,00 $.
Extension of Time Claims and Prolongation Cost Computation template in professional printed format with Primavera professional file.
Prolongation cost calculation MS Excel sheet also included in this package. The claim was submitted to the consultant and it got approved conditionally.
Time impacted delay analysis for a Construction project.
| Weight | 0,5 kg |
|---|---|
| Dimensions | 30 × 22 × 3 cm |






Ahmed K. (verified owner) –
Excellent quality template, very professional and well-structured.
Mohammed S. (verified owner) –
Great document, saved me a lot of time on my project.
John D. (verified owner) –
Very comprehensive and easy to customize. Highly recommended.