awaiting-response

approval for extension of time and variation approval issue

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject            : Regarding approval for extension of time and variation approval issue and our issue for additional prolong preliminary cost claim (490 days till date) Dear Sir, With […]

approval for extension of time and variation approval issue Read Post »

Variation Order Request

Resubmission of variation order 16R1 details

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject          : Resubmission of variation order 16R1 details for 14th floor (Mechanical and Health Club Framing Plan) due to revised drawings. Dear Sir, With reference to the above,

Resubmission of variation order 16R1 details Read Post »

TV Socket

Switch socket location mismatching with opening in head board

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Sub         : Regarding electrical switch socket location mismatching with opening in head board to receive switches and sockets cover and issue at site.      Dear Sir, With reference to above , and our

Switch socket location mismatching with opening in head board Read Post »

Site Meeting

Inspection of ledge wall and comments

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Sub    : Inspection of ledge wall and comments as well as site meeting on Monday dtd-xxx with Denloex/Client/Consultant. Dear Sir, With reference to above, we would like to

Inspection of ledge wall and comments Read Post »

Change order & our concern for our variation order

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Sub       : Change order & our concern for our variation order no-23 and confirmation /instruction to excecute the work. Dear Sir,  With reference to above, your change directive issue

Change order & our concern for our variation order Read Post »

approved sample carpet

Provide the approved sample of the carpet and with thickness of inlay

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Sub          : Regarding provide the approved sample of the carpet and with thickness of inlay. Dear Sir, With reference to above, the floor carpet is under PC rate we want

Provide the approved sample of the carpet and with thickness of inlay Read Post »

subcontractor contract agreement.

Submission of contract documents from xxx Kitchen Equipment LLC.

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Sub          : Regarding submission of contract documents from xxx Kicthen Equipment LLC. Dear Sir With reference to above, we are hereby submitting the contract documents form Emirates Kicthen

Submission of contract documents from xxx Kitchen Equipment LLC. Read Post »

CCTV Camera

CCTV camera drawing approval from Dubai police

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Project     : 2B + G + 14+ Lower Roof Hotels Building on Plot No. 373-1297 at Barsha,Dubai  Sub          : Regarding CCTV camera drawing approval from Dubai police. Dear Sir With

CCTV camera drawing approval from Dubai police Read Post »

Transformer

To confirm the drive way design to take load of Crane and transformer

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Project     : 2B + G + 14+ Lower Roof Hotels Building on Plot No. 373-1297 at Barsha,Dubai  Sub          : To confirm that drive way design to take load

To confirm the drive way design to take load of Crane and transformer Read Post »

Kitchen Equipment

Confirmation of MEP service location marking by the Kitchen Subcontractor

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai   ub          : Regarding marking checked by the Kicthen sub contractor and intimation for the rework. Dear Sir, With reference to the above mentioned subject, we would like

Confirmation of MEP service location marking by the Kitchen Subcontractor Read Post »