METHOD STATEMENT FOR ELECTRICAL GALVANIZED CONDUITS INSTALLATION

METHOD OF STATEMENT FOR DRAINAGE PIPE INSTALLATION INSIDE THE TOILET

METHOD OF STATEMENT FOR DRAINAGE PIPE INSTALLATION INSIDE THE TOILET Open an approved shop drawings. This shop drawings consist of approved Toilet details and mechanical pipe sleeves location for both indoor unit refrigeration pipes and sanitary fixtures ventilation. Block work (except the shaft walls) and water proofing activity should be done first before installation. Waiting […]

METHOD OF STATEMENT FOR DRAINAGE PIPE INSTALLATION INSIDE THE TOILET Read Post »

uPVC High Pressure Water Supply Piping System Installation Procedure

METHOD OF STATEMENT FOR MECHANICAL WORKS FOR SANITARY DRAINAGE

METHOD OF STATEMENT FOR MECHANICAL WORKS FOR SANITARY DRAINAGE Scope: This method of statement applies to mechanical works for sanitary drainage of buildings. Purpose: The basis of construction /installation for effective and qualified results Significant materials needed: Approved shop drawing (At site) PVC schedule 40 pipes and fittings (Trans.#         ) PVC Joining Compounds and cleaner

METHOD OF STATEMENT FOR MECHANICAL WORKS FOR SANITARY DRAINAGE Read Post »

Butterfly Valve Installation and Maintenance Procedure

METHOD OF STATEMENT FOR WATER SUPPLY PIPE INSTALLATION INSIDE THE TOILET

METHOD OF STATEMENT FOR WATER SUPPLY PIPE INSTALLATION INSIDE THE TOILET Open an approved toilet detail shop drawing. This drawing should be accompanied with the approved location of mechanical pipe sleeves for both A/C indoor unit refrigeration tubes/pipes and sanitary fixtures ventilation. Installation of pipes should be done after the block work inside the toilet.

METHOD OF STATEMENT FOR WATER SUPPLY PIPE INSTALLATION INSIDE THE TOILET Read Post »

uPVC High Pressure Water Supply Piping System Installation Procedure

METHOD OF STATEMENT OF UNDERGROUND PIPE INSTALLATION

METHOD OF STATEMENT OF UNDERGROUND PIPE INSTALLATION Summary:   This Method of Statement includes all the underground sewer                               pipe installation. 1. Procedure Excavate trenches to provide a clearance 200mm on each of the pipe. Bedding to be compacted in layers not exceeding 150mm to give uniform bed. Lay the pipe directly on the bedding.

METHOD OF STATEMENT OF UNDERGROUND PIPE INSTALLATION Read Post »

uPVC High Pressure Water Supply Piping System Installation Procedure

METHOD OF STATEMENT FOR DRAINAGE PIPE INSTALLATION INSIDE THE TOILET

METHOD OF STATEMENT FOR DRAINAGE PIPE INSTALLATION INSIDE THE TOILET Open an approved shop drawings. This shop drawings consist of approved Toilet details and mechanical pipe sleeves location for both indoor unit refrigeration pipes and sanitary fixtures ventilation. Block work (except the shaft walls) and water proofing activity should be done first before installation. Waiting

METHOD OF STATEMENT FOR DRAINAGE PIPE INSTALLATION INSIDE THE TOILET Read Post »

METHOD STATEMENT FOR WIRES AND CABLES INSTALLATION

METHOD STATEMENT MEGGER TESTING FOR POWER CABLES & BRANCH CIRCUIT WIRING

METHOD STATEMENT MEGGER TESTING FOR POWER CABLES & BRANCH CIRCUIT WIRING EQUIPMENT AND TOOLS:- 1.       Megger Instrument shall be having valid calibration. 2.       Megger-with range 500V/1000V shall be used for conducting the test.           Megger range 500 V shall be used for Wire testing           Megger range 1000 V shall be used for Cable testing

METHOD STATEMENT MEGGER TESTING FOR POWER CABLES & BRANCH CIRCUIT WIRING Read Post »

Concreting-of-reinforced-concrete-slab-photo-by-the-author-of-the-paper

METHOD OF STATEMENT FOR SLAB ON GRADE

METHOD OF STATEMENT FOR SLAB ON GRADE Summary:   This Method of Statement includes the following; I.  All Slab on Grade  II. Approved Materials:     1. Polythelene Sheets Transmittal # C-004     2. Wiremesh Transmittal # C-454 (for approval)     3. Seifban TC Transmittal # G-456 or Guard 20 TC Transmittal #G-          0478  1.

METHOD OF STATEMENT FOR SLAB ON GRADE Read Post »

Scroll to Top