ACTIVITY HAZARD ANALYSIS Casting Blinding Concrete and Installation of Precast Box Culvert Units

HAZARD / WORK: Casting Blinding Concrete and Installation of Precast                                          Box Culvert Units LOCATION:______________________________________________ H=High                        M=Medium                   L=Low                                Significant Risks H M L   Who May Be Harmed 1 Work related upper limb disorders. Musculoskeletal injuries. Cuts, abrasions. Foot / toe injuries     X       2 Dehydration, heat exhaustion. Heat stroke     X   Employees…………………… X […]

METHOD STATEMENT FOR PLACING OF SELECT FILL

Table of Contents Purpose Scope of Work Definitions References Materials Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments 1.0       Purpose To ensure that placing of select fill material and related activities are executed safely and in accordance with the contract requirements and that all quality assurance / control activities are conducted in a systematic manner, works are inspected and […]

JOB HAZARD ANALYSIS PLACING OF SELECT FILL

The responsible person is to ensure the control measures below are in place before the activity is carried out   TASK: Placing of Select Fill     Date:07 October 2006 No ACTIVITY HAZARD RISK CONTROL MEASURES TO MINIMISE / ELIMINATE RISK RESPONSIBLE PERSON 1 Service location survey Manual handling operations (MHO’s) Work related upper limb disorders. Musculoskeletal injuries. Cuts, abrasions. […]

ACTIVITY HAZARD ANALYSIS PLACING OF SELECT FILL

HAZARD / WORK: PLACING OF SELECT FILL LOCATION:______________________________________________ H=High                        M=Medium                   L=Low                                Significant Risks H M L   Who May Be Harmed 1 Work related upper limb disorders. Musculoskeletal injuries. Cuts, abrasions. Foot / toe injuries.     X       2 Dehydration, heat exhaustion. Heat stroke     X   Employees…………………… X 3 Cuts, abrasions, broken bones, eye injuries […]

JOB HAZARD ANALYSIS TOOLBOX TALKS ATTACHMENTS Manual Handling COSHH Excavations NOISE

Toolbox talks:-Manual HandlingCOSHHExcavationsNOISE Manual Handling We lift, manoeuvre and handle goods every day of our lives in one way or another, not just whilst at work but also during social activities such as gardening, DIY, shopping and sport. A bad back or injury today, could, and regularly does, turn into a painful back problem for life! Lifting incorrectly could also […]

Method Statement for Construction of AGL Ducts and Installation of Precast AGL Lighting Pits

CONTENTS Scope of Work Definitions References Subcontractors Materials Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments Scope of Work This procedure is applicable to the following works associated with the project titled, “New 2k Runway- Main Runway Works” – Contract Number NRTW-1008-CN. This method statement outlines the procedures to be followed in the construction of AGL future ducts & […]

JOB HAZARD ANALYSIS Construction of AGL Ducts & installation of precast AGL Lighting Pits

The responsible person is to ensure all the controls below are in place before the activity takes place   TASK: ­­­­­­­ Construction of AGL Ducts & installation of precast AGL Lighting Pits     Date: 04 November 2006 No ACTIVITY HAZARD RISK CONTROL MEASURES TO MINIMISE / ELIMINATE RISK RESPONSIBLE PERSON 1 Service location survey Manual handling operations (MHO’s) Work […]

CTIVITY HAZARD ANALYSIS – Construction of AGL Ducts & installation of precast AGL Lighting Pits

HAZARD / WORK:       AHA Construction of AGL Ducts & installation of precast AGL Lighting Pits LOCATION:______________________________________________ H=High                        M=Medium                   L=Low                                Significant Risks H M L   Who May Be Harmed 1 Work related upper limb disorders. Musculoskeletal injuries. Cuts, abrasions. Foot / toe injuries     X       2 Dehydration, heat exhaustion. Heat stroke     X   Employees…………………… […]

Method Statement for Protection of Existing Gas Pipelines Using Precast Concrete Slabs

CONTENTS Purpose Scope of Work Definitions References Materials Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments 1.0      Purpose To ensure that the protection of existing gas pipelines using precast concrete slabs, and related activities are executed safely and in accordance with the contract requirements and that all quality assurance / control activities are conducted in a systematic manner, works […]

Method Statement for Excavation and Foundation Preparation of Box Culvert

Table of Contents Purpose Scope of Work Definitions References Materials Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments   1.0       Purpose To ensure that all excavation and foundation preparation of Box Culvert activities are executed safely and in accordance with the contract requirements and that all quality assurance / control activities are conducted in a systematic manner, works are […]