ACTIVITY HAZARD ANALYSIS Construction of Open Grouted Riprap Formed Channel

HAZARD / WORK: Construction of Open Grouted Riprap Formed Channel LOCATION:   H=High                        M=Medium                   L=Low                                Significant Risks H M L   Who May Be Harmed 1 Work related upper limb disorders. Musculoskeletal injuries. Cuts, abrasions. Foot / toe injuries     X       2 Dehydration, heat exhaustion. Heat stroke     X   Employees…………………… X 3 Cuts, abrasions, broken […]

Method Statement for Construction of Open Concrete Formed Channel

CONTENTS Purpose Scope of Work Definitions References Materials Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments Purpose 1.1       To ensure that the open concrete formed channel is executed safely and in accordance with the contract requirements and that all quality assurance/ control activities are conducted in a systematic manner, works are inspected and conformance is verified and documented. Scope […]

JOB HAZARD ANALYSIS Construction of Open Concrete Formed Channel

  TASK: ­­­­­­­­ Construction of Open Concrete Formed Channel (Types 2a and 2b)     Date: August 23, 2006 No ACTIVITY HAZARD RISK CONTROL MEASURES TO MINIMISE / ELIMINATE RISK RESPONSIBLE PERSON 1 Service location survey Manual handling operations (MHO’s) Work related upper limb disorders. Musculoskeletal injuries. Cuts, abrasions. Foot / toe injuries Maximum use of equipment to reduce need […]

ACTIVITY HAZARD ANALYSIS Construction of Open Concrete Formed Channel

HAZARD / WORK: Construction of Open Concrete Formed Channel LOCATION:                                                                                                  H=High                        M=Medium                   L=Low                                Significant Risks H M L   Who May Be Harmed 1 Work related upper limb disorders. Musculoskeletal injuries. Cuts, abrasions. Foot / toe injuries     X       2 Dehydration, heat exhaustion. Heat stroke     X   Employees…………………… X 3 Cuts, abrasions, […]

JOB HAZARD ANALYSIS TOOLBOX TALKS ATTACHMENTS Manual Handling COSHH NOISE

Toolbox talks:-Manual HandlingCOSHHNOISE Manual Handling We lift, maneuver and handle goods every day of our lives in one way or another, not just whilst at work but also during social activities such as gardening, DIY, shopping and sport. A bad back or injury today, could, and regularly does, turn into a painful back problem for life! Lifting incorrectly could also […]

JOB HAZARD ANALYSIS Placing of Sub-base and Gravel base

The responsible person is to ensure the control measures below are in place before the activity is carried out   TASK: Placing of Sub-base and Gravel base     Date:28 September xxx No ACTIVITY HAZARD RISK CONTROL MEASURES TO MINIMISE / ELIMINATE RISK RESPONSIBLE PERSON 1 Service location survey Manual handling operations (MHO’s) Work related upper limb disorders. Musculoskeletal injuries. […]

ACTIVITY HAZARD ANALYSIS Placing of Sub-base and Gravel base

HAZARD / WORK: Placing of Sub-base and Gravel base LOCATION:______________________________________________ H=High                        M=Medium                   L=Low                                Significant Risks H M L   Who May Be Harmed 1 Work related upper limb disorders. Musculoskeletal injuries. Cuts, abrasions. Foot / toe injuries.     X       2 Dehydration, heat exhaustion. Heat stroke     X   Employees…………………… X 3 Cuts, abrasions, broken bones, […]

Method Statement for Placing Sub-Base and Gravel Base by Pavers

CONTENTS Purpose Scope of Work Definitions References Materials Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments 1.0    Purpose To ensure that placing of sub-base and gravel base by pavers, and related activities are executed safely and in accordance with the contract requirements and that all quality assurance / control activities are conducted in a systematic manner, works are inspected […]

Method Statement for Casting of Blinding Concrete for Box Culvert and Installation of Precast Box Culvert Units

TABLE OF CONTENTS Purpose Scope of Work Definitions References Materials Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments 1. Purpose 1.1 To ensure that the Blinding of Box Culverts and Installation of Precast Box Culvert units are executed safely and in accordance with the contract requirements and that all quality assurance/ control activities are conducted in a systematic manner, […]

JOB HAZARD ANALYSIS Casting Blinding concrete and Installation of Precast Box culverts

  TASK: ­­­­­­­­ Casting Blinding concrete and Installation of Precast Box culverts     Date:5th Aug 2006 No ACTIVITY HAZARD RISK CONTROL MEASURES TO MINIMISE / ELIMINATE RISK RESPONSIBLE PERSON 1 Service location survey Manual handling operations (MHO’s) Work related upper limb disorders. Musculoskeletal injuries. Cuts, abrasions. Foot / toe injuries Maximum use of equipment to reduce need for MHO’s […]