ACTIVITY HAZARD ANALYSIS Grouting of Pipes in Stormwater Single and Double Pipe Catchpits

HAZARD / WORK:       Grouting of Pipes in Stormwater Single and Double Pipe Catchpits (Types 1, 2 & 3) LOCATION: ______________________________________________ H=High                        M=Medium                   L=Low                                Significant Risks H M L   Who May Be Harmed 1 Work related upper limb disorders. Musculoskeletal injuries. Cuts, abrasions. Foot / toe injuries     X       2 Dehydration, heat exhaustion. Heat stroke […]

Method Statement For GRP LAMINATION

CONTENTS Purpose Scope of Work Definitions References Materials Tools, Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments Purpose 1.1       To ensure that the GRP lamination in sewage manhole and inspection chamber is executed safely and in accordance with the contract requirements and that all quality assurance/ control activities are conducted in a systematic manner, works are inspected and conformance […]

Toolbox talks for Application of ISOLA N-S Grout

Toolbox talks:-Manual HandlingCOSHHExcavationsNOISE Manual Handling We lift, manoeuvre and handle goods every day of our lives in one way or another, not just whilst at work but also during social activities such as gardening, DIY, shopping and sport. A bad back or injury today, could, and regularly does, turn into a painful back problem for life! Lifting incorrectly could also […]

Method Statement for Application of ISOLA N-S Grout Material

CONTENTS Purpose Scope of Work Definitions References Materials Tools, Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments Purpose 1.1       To ensure that the application of ISOLA N-S Grout Material is executed safely and in accordance with the contract requirements and that all quality assurance/ control activities are conducted in a systematic manner, works are inspected and conformance is verified […]

JOB HAZARD ANALYSIS Application of ISOLA N-S Grout

The responsible person is to ensure the control measures below are in place before the activity is carried out   TASK: Application of ISOLA N-S Grout     Date:18 December 2006 No ACTIVITY HAZARD RISK CONTROL MEASURES TO MINIMISE / ELIMINATE RISK RESPONSIBLE PERSON 1 Service location survey Manual handling operations (MHO’s) Work related upper limb disorders. Musculoskeletal injuries. Cuts, […]

ACTIVITY HAZARD ANALYSIS Application of ISOLA N-S Grout

HAZARD / WORK: Application of ISOLA N-S Grout LOCATION:______________________________________________ H=High                        M=Medium                   L=Low                                Significant Risks H M L   Who May Be Harmed 1 Work related upper limb disorders. Musculoskeletal injuries. Cuts, abrasions. Foot / toe injuries     X       2 Dehydration, heat exhaustion. Heat stroke     X   Employees…………………… X 3 Cuts, abrasions, broken bones, eye […]

Method Statement for Placing of Surface Protection Material

CONTENTS Purpose Scope of Work Definitions References Materials Tools, Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments 1.0       Purpose To ensure that placing of surface protection material and related activities are executed safely and in accordance with the contract requirements and that all quality assurance/control activities are conducted in a systematic manner, works are inspected and conformance is verified […]

Method Statement for Placing of Surface Protection Material

CONTENTS 1.0 Purpose 2.0 Scope of Work 3.0 Definitions 4.0 References 5.0 Materials 6.0 Tools, Plant & Equipment 7.0 Safety 8.0 Prior Activities 9.0 Procedure 10.0 Responsibilities 11.0 Attachments 1.0 Purpose 1.1 To ensure that placing of surface protection material and related activities are executed safely and in accordance with the contract requirements and that all quality assurance/control activities are […]

Method Statement for Backfilling of Building Structures

TABLE OF CONTENTS Purpose Scope of Work Definitions References Materials Tools, Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments Purpose 1.1       To ensure that the backfilling of building structures is executed safely and in accordance with the contract requirements and that all quality assurance/ control activities are conducted in a systematic manner, works are inspected and conformance is verified […]