CHECKLIST FOR SMOKE MANAGEMENT SYSTEM – PRE-COMMISSIONING AND COMMISSIONING

METHOD STATEMENT FOR TESTING & COMMISSIONING OF VENTILATION AND EXHAUST FANS

METHOD STATEMENT FOR TESTING & COMMISSIONING OF VENTILATION AND EXHAUST FANS CONTENTS 1.0 PURPOSE 2.0 SCOPE 3.0 REFERENCES 4.0 DEFINITIONS 5.0 RESPONSIBILITIES 6.0 EQUIPMENTS 7.0 PROCEDURE 8.0 ATTACHMENTS     1.0 PURPOSE This method statement is applicable for the Testing & Commissioning of Ventilation and General Exhaust Fans Units for the project as mentioned in […]

METHOD STATEMENT FOR TESTING & COMMISSIONING OF VENTILATION AND EXHAUST FANS Read Post »

CHECKLIST FOR SMOKE MANAGEMENT SYSTEM – PRE-COMMISSIONING AND COMMISSIONING

METHOD STATEMENT FOR INSTALLATION TESTING AND COMMISSIONING OF SMOKE MANAGEMENT SYSTEM

CONTENTS 1.0      PURPOSE 2.0      SCOPE 3.0      REFERENCES 4.0      DEFINITIONS 5.0      RESPONSIBILITIES 6.0      EQUIPMENT & MATERIALS 7.0      PROCEDURE 8.0      ATTACHMENTS   1.0 PURPOSE This method statement is applicable for the sequence & Methodology that will be used for the Installation, testing and commissioning of Smoke Management System as mentioned in the Specifications & Approved Shop Drawings.

METHOD STATEMENT FOR INSTALLATION TESTING AND COMMISSIONING OF SMOKE MANAGEMENT SYSTEM Read Post »

METHOD STATEMENT ENGINEERED WOOD FLOORING

METHOD STATEMENT ENGINEERED WOOD FLOORING

METHOD STATEMENT FLOOR THICKNESS: 7/9/10/13/15/20/30mm FLOATING & GLUE-DOWN INSTALLATION METHOD RECEIVING & STORING PRE-INSTALLATION & SURFACE PREPARATION INSTALLATION & FINAL INSPECTION RECEIVING & STORAGE ITEM No. ACCEPTANCE CRITERIA   REFERENCE A ENGINEERED WOOD FLOORING RECEIVING & STORAGE   A1     A2     A3 PACKAGING Wood flooring bundles shall be shipped and received in

METHOD STATEMENT ENGINEERED WOOD FLOORING Read Post »

Scroll to Top