METHOD OF STATEMENT FOR CORING IN CORE WALL

1.0       SCOPE OF WORK This Method Statement is applicable for coring in core wall 2.0       RESPONSIBILITY Before commencement of any installation activity, the following procedures are required to be carried out. Before installations ensure the location will be supervised by client safety team. Should be aware of the sound due to coring. Should close the staircase to avoid the client […]

METHOD STATEMENT SURFACE MOUNTED CONDUITS

TABLE OF CONTENTS Scope / Objective Reference Access / Egress Health and Safety Hazards Safety Lighting Task Lighting Emergency Arrangements General Fire Precautions Communication Risks Control Hazards / Risks Control Measures / Permits 3rd Party Protection Environmental Considerations Definitions Responsibilities / Supervision Procedures / Method to be Employed Training Working Hours House Keeping Manpower Requirement & Supervision Material Requirement Plant […]

METHOD STATEMENT BUSBAR TRUNKING SYSTEM

TABLE OF CONTENTS Scope / Objective Reference Access / Egress Health and Safety Hazards Safety Lighting Task Lighting Emergency Arrangements General Fire Precautions Communication Risks Control Hazards / Risks 3rd Party Protection Environmental Considerations Definitions Responsibilities / Supervision Procedures / Method to be Employed Training Working Hours House Keeping Manpower Requirement & Supervision Material Requirement Plant & Equipment General Plant […]

METHOD STATEMENT FOR TESTING & COMMISSIONING OF VENTILATION AND EXHAUST FANS

METHOD STATEMENT FOR TESTING & COMMISSIONING OF VENTILATION AND EXHAUST FANS CONTENTS 1.0 PURPOSE 2.0 SCOPE 3.0 REFERENCES 4.0 DEFINITIONS 5.0 RESPONSIBILITIES 6.0 EQUIPMENTS 7.0 PROCEDURE 8.0 ATTACHMENTS     1.0 PURPOSE This method statement is applicable for the Testing & Commissioning of Ventilation and General Exhaust Fans Units for the project as mentioned in the Specifications & Approved Shop […]