METHOD STATEMENT FOR INSTALLATION OF FCUs

TABLE OF CONTENTS                 1.0    Revision Status   Rev No. Date Prepared By Checked By Reviewed By Arabtech Approved Revision Description     0 15 Oct 2004 CH. ATHANASIOU S.GEORGIOU G. GEORGHIOU M. PICKUP FIRST SUBMITTAL                                   […]

METHOD OF STATEMENT FOR REPLACING OF OLD CABLE & INSTALLING NEW CABLES

1.0       SCOPE OF WORK This Method Statement is applicable for Replacing of old fire cable & installing new conduit. 2.0       RESPONSIBILITY Before commencement of any installation activity, the following procedures are required to be carried out. All materials used must have an approved material submittal. Proceed with installation only after unsatisfactory conditions have been corrected. 3.0       DESCRIPTION OF WORK Installation […]

METHOD STATEMENT FIRE ALARM / AUDIO SYSTEM

TABLE OF CONTENTS Scope / Objective Reference Access / Egress Health and Safety Hazards Safety Lighting Task Lighting Emergency Arrangements General Fire Precautions Communication Risks Control Hazards / Risks 3rd Party Protection Environmental Considerations Definitions Responsibilities / Supervision Procedures / Method to be Employed Training Working Hours House Keeping Manpower Requirement & Supervision Material Requirement Plant & Equipment General Plant […]

METHOD STATEMENT EMERGENCY LIGHTING SYSTEM

TABLE OF CONTENTS Scope / Objective Reference Access / Egress Health and Safety Hazards Safety Lighting Task Lighting Emergency Arrangements General Fire Precautions Communication Risks Control Hazards / Risks 3rd Party Protection Environmental Considerations Definitions Responsibilities / Supervision Procedures / Method to be Employed Training Working Hours House Keeping Manpower Requirement & Supervision Material Requirement Plant & Equipment General Plant […]

METHOD STATEMENT ELECTRICAL INSTALLATION (Small Power & Lighting) TESTING

TABLE OF CONTENTS Scope/objective References Access/Egress Health and safety Hazards a. Safety Rules during testingb. Safety lightingc. Task lightingd. Emergency arrangements• General• Fire Precautions• Communicatione. Risks Control• Hazards/Risks• 3rd Party Protection• Environmental Considerations Definitions Responsibilities/supervision Procedures/Method to be Employed Training Working hours House keeping Manpower Requirements & Supervision Testing Instruments Requirements Plant & Equipment a. Generalb. Plant and equipment schedulec. […]

METHOD STATEMENT FOR INSTALLATION & INSULATION OF DUCTWORK

TABLE OF CONTENTS Scope / Objective Reference Access / Egress Health and Safety Hazards Safety Lighting Task Lighting Emergency Arrangements General Fire Precautions Communication Risks Control Hazards / Risks Control Measures / Permits 3rd Party Protection Environmental Considerations Definitions Responsibilities / Supervision Procedures / Method to be Employed Training Working Hours House Keeping Manpower Requirement & Supervision Material Requirement Plant […]

METHOD STATEMENT DISTRIBUTION BOARDS

TABLE OF CONTENTS Scope / Objective Reference Access / Egress Health and Safety Hazards Safety Lighting Task Lighting Emergency Arrangements General Fire Precautions Communication Risks Control Hazards / Risks 3rd Party Protection Environmental Considerations Definitions Responsibilities / Supervision Procedures / Method to be Employed Training Working Hours House Keeping Manpower Requirement & Supervision Material Requirement Plant & Equipment General Plant […]

METHOD OF STATEMENT FOR INSTALLING FIRE DAMPER

1.0       SCOPE OF WORK This Method Statement is applicable for installation of Fire Damper. 2.0       RESPONSIBILITY Before commencement of any installation activity, the following procedures are required to be carried out. All materials used must have an approved material submittal. Check that delivered material is in compliance with approved submittal. Check for any physical damages upon receipt of the same […]