Narrative report for As-Planned vs. As-Built delay Analysis.

Project Overview Introduction This report provides a detailed comparison between the As-Planned and As-Built schedules for the ABC Tower Construction Project. The analysis aims to identify and quantify delays by comparing the originally planned schedule (baseline) with the actual progress made to date. The As-Planned vs. As-Built delay analysis is crucial for understanding the reasons behind project delays, evaluating the […]

Narrative report for a impacted Schedule.

Project Overview Introduction This narrative report outlines the impacts on the schedule for the ABC Tower Construction Project, due to various unforeseen events and project disruptions. The impacted schedule represents the deviation from the original baseline caused by these events, including delays in critical path activities and changes in work sequencing. The purpose of this report is to detail the […]

Narrative report for a revise Baseline Schedule.

Project Overview Introduction This report provides a detailed explanation of the revised baseline schedule for the ABC Tower Construction Project. The revision of the baseline schedule has been necessitated by a number of factors, including design changes, unforeseen site conditions, and necessary adjustments in work sequencing to optimize project efficiency and address the current project status. This revised baseline will […]

Narrative report for a Mitigation Schedule.

Project Overview Introduction This report provides an overview of the Mitigation Schedule developed for the ABC Tower Construction Project. The mitigation schedule is designed as a proactive measure to prevent potential delays from impacting the project’s critical path and overall completion date. Unlike a recovery schedule, which is implemented after a delay has occurred, the mitigation schedule is focused on […]

Narrative report for a Recovery Schedule.

Project Overview Introduction This report outlines the development and implementation of the Recovery Schedule for the ABC Tower Construction Project. Due to unforeseen delays in key activities, the project has fallen behind its original baseline schedule. The purpose of the recovery schedule is to mitigate the delays, restore progress to the critical path, and ensure that the project is completed […]

Narrative report for a Baseline Schedule.

Project Overview Introduction This report presents the baseline schedule for the ABC Tower Construction Project, outlining the key phases, activities, and milestones. The baseline schedule has been developed using Primavera P6 and serves as the initial project plan against which future project performance will be measured. The objective of the schedule is to ensure that the project is completed within […]

Factor to consider while writing a narrative report for extension of time claim.

When writing a narrative report for an Extension of Time (EOT) claim, it’s essential to provide a clear, structured, and well-supported argument to justify the requested extension. Here are key factors to consider when preparing the report: 1. Factual Accuracy and Clarity Ensure that the report is factually accurate and clearly written. Misrepresentations, unclear statements, or vague details can weaken […]

How to Write a Narrative Report for an Extension of Time (EOT) Claim Submission.

Introduction An Extension of Time (EOT) claim narrative report provides a clear, detailed explanation of the reasons for requesting more time to complete a project. The narrative should be structured logically, outlining the causes of the delay, the impact on the project, and how the delays justify additional time. A well-prepared report includes factual information, supporting documentation, and a concise […]

Narrative Report for Extension of Time (EOT) Claim.

Introduction Project Overview: Background: ABC Construction Ltd. was awarded the contract for the XYZ Mixed-Use Development on January 1, 2023, with an agreed contract duration of 18 months, aiming for completion by July 31, 2024. The scope of work included the construction of a high-rise mixed-use building with commercial and residential spaces, along with a parking garage and related infrastructure. […]

Time-Impact Analysis (TIA) in Construction Projects – An Extensive Guide.

Introduction Time-Impact Analysis (TIA) is a widely used method for assessing the impact of delays on a construction project’s schedule. It is a prospective analysis that evaluates the effects of potential or actual changes (e.g., delays, disruptions, additional work) on the project timeline. The goal of TIA is to determine how an event will affect the project’s completion date and […]