Method Statement Title: Installation of Cables and Wires

Method Statement Title: Installation of Cables and Wires 1.0       Scope Note: 1) Refer method statement Ref. No ETA/MS/E-005 for installation of cable trays and ladders. 2.0       Material 3.0       Applicable Location             3.1       Tower E1, E2, E3, W1, W2, W3, Podium and Villas. 4.0       Method 4.1       Storage   4.1.1    All materials received at site shall be inspected and ensured that the […]

Method Statement Title: Installation of Emergency Lighting System

1.0       Scope This method statement details the method of installation of Emergency Lighting System, as per Project Specification 16536             Note             A separate Method Statement Ref. ETA/MS/E- 034 shall be submitted for testing and commissioning of the Emergency Lighting System. 2.0       Material 2.3       Type of emergency / exit luminaire shall be as per approved shop drawings.             2.4       Direction […]

Method Statement Title: Installation of CO detection and Alarm System

Method Statement Title: Installation of CO detection and Alarm System 1.0       Scope This method statement details the method of installation of CO detection and alarm system. NOTE :           1. Testing and Commissioning of CO Detection and Alarm system will be submitted separately under Ref. ETA/MS/E-007. 2.0       Material 3.0       Applicable Location and First Floor) 4.0       Method 4.1       Storage 4.1.1    All materials […]

Method Statement Title: Installation of Cable Trays and Ladders

Method Statement Title: Installation of Cable Trays and Ladders 1.0       Scope 1.1       This method statement details the method of installation of cable trays and ladders. 2.0       Material 2.1       Cable trays and ladders and accessories shall be as per approved material submittal.  3.0       Applicable Location 3.1       Tower E1, E2, E3, W1, W2, W3 and Podium – Electrical closet, ELV closet and […]

Method Statement Title: Installation of Earthing System

Method Statement Title: Installation of Earthing System 1.0       Scope 1.1       This method statement details the method of installation of Earthing System as per specification section 16060. 2.0       Material 2.1       Material used for the system is as per BS : 7671 and BS : 7430.  3.0       Applicable Locations 4.0       Method 4.1       Storage   6.0       Safety 6.1       All safety precautions shall be […]

Method Statement Title: Installation of Motor Control Centre ( MCC ) & Variable Frequency Drives ( VFDs )

Method Statement Title: Installation of Motor Control Centre ( MCC ) & Variable Frequency Drives ( VFDs ) 1.0       Scope This method statement details the method of installation of Motor Control Centres and Variable Frequency Drives, as per project Specification Sections 16472 and 15725.             Note: A separate Method Statements shall be submitted for testing and                      commissioning. 2.0       Material […]

Method Statement Title: Installation of Capacitor Banks

1.0       Scope 2.0       Material 3.0       Applicable Location 4.0       Method 4.1       Storage   4.2       Installation 4.2.1    Ensure approved documents like shop drawing and electrical room             layouts are available with the installation team.             channel.                                     pieces fallen during cable cutting and terminating process.                                     specification requirement. 5.0       Safety 5.1       Safety Officer shall ensure that the technicians have undergone safety             […]

Method Statement Title: Installation of Light Fixtures.

1.0       Scope This method statement details the method of installation of Lighting Fixtures as per Project Specification 16505.             Note             A separate Method Statement Ref. ETA/MS/E-40 shall be submitted for testing and commissioning of the Lighting Fixtures. 2.0       Material 2.3       Type of  luminaries shall be as per approved shop drawings. 3.0       Applicable Location             3.1       Tower E1,E2,E3 & W1,W2,W3, […]

Method Statement Title: Installation, Testing and Commissioning of Sub Main Distribution Boards (SMDB’s)

1.0       Scope 2.0       Material 3.0       Applicable Location 4.0       Method 4.1       Storage   4.2       Installation 5.0       Testing & Commissioning:             5.1       Instruments. Note : The instruments used for  testing and commissioning shall be checked and ensured that they are calibrated and the current valid calibration reports are filed for record.           5.2         Method 6.0       Safety 6.1       Safety Officer shall ensure that […]