Delay in the certification of our invoice

Delay penalty due to failure to fulfil contractual obligations.

REF. No.: xxx/1016/SS-DOC/2022/2 Date: 31 October xxx xxx DEWATERING & LAND DRAINING CO. L.L.C. P.O. Box: 20782, Ras Al Khor, Dubai, UAE Project:Proposed Residential Villa (B+G+1+R) on Plat No. xxx, Palm Jumeirah– Dubai, UAE Client:Mr. xxx Subject: Delay penalty due to failure to fulfil contractual obligations. Dear Sir, We refer to the lump sum fixed […]

Delay penalty due to failure to fulfil contractual obligations. Read Post »

Reply - Notice of Delay

Re: Dewatering Works Delay Penalty

REF. No.: xxx/1016/SS-DOC/2022/03 Date: 1 November xxx xxx DEWATERING & LAND DRAINING CO. L.L.C. P.O. Box: xxx, Ras Al Khor, Dubai, UAE Project:Proposed Residential Villa (B+G+1+R) on Plat No. xxx, Palm Jumeirah– Dubai, UAE Client:Mr. xxx Subject: Re: Dewatering Works Delay Penalty Dear Mr. xxx, This is further to your letter ref. xxx/LR/JJ/J-8218-03/2022 dated 1st

Re: Dewatering Works Delay Penalty Read Post »

Undertaking Letter

Reply – response of Interim Extension of Time Claim (EOT-01)

Ref.:                     XXX/1020/AA/XXX/05 Date:                   October 27, XXX To:                       M/s. XXXX ARCHITECTURAL & ENGINEERING CONSULTANCYOffice No. XXXX, Sobha Ivory 2, Business Bay P.O. Box XXX, Dubai, UAE Attention:         Engr. XXXX – Resident Engineer Project:              Proposed G+1 & Service Block (R-9) Villa, On Plot No. xxxx at Al Barari – Dubai, UAE. Client:                Mr.

Reply – response of Interim Extension of Time Claim (EOT-01) Read Post »

uPVC High Pressure Water Supply Piping System Installation Procedure

METHOD STATEMENT FOR UNDERGROUND DRAINAGE PIPING

METHOD STATEMENT FOR UNDERGROUND DRAINAGE PIPING TABLE OF CONTENTS 1.1. The objective of this method statement is to establish the necessary guidelines for the installation of underground drainage in accordance with the contract requirements. This method Statement shall ensure that the installation of underground drainage is executed safely and in accordance with the contract requirements.

METHOD STATEMENT FOR UNDERGROUND DRAINAGE PIPING Read Post »

JOB HAZARD ANALYSIS TOOLBOX TALKS ATTACHMENTS Casting Blinding Concrete for Foundation Building Structures

RADIOGRAPHIC TESTING OPERATING PROCEDURE

RADIOGRAPHIC TESTING OPERATING PROCEDURE Table of Contents 3                References                                                              3 9                Processing Radiographs                                        12 1.       SCOPE: This General Procedure describes the technique and parameters for radiographic testing. This Procedure covers the material thickness range upto 200 mm in all carbon steel material or equivalent thickness in other materials. The surface of the work-piece shall be

RADIOGRAPHIC TESTING OPERATING PROCEDURE Read Post »

Hazard Meaning and Definition

SAFETY PROCEDURE RADIOGRAPHY SAFETY PROCEDURE

SAFETY PROCEDURE RADIOGRAPHY SAFETY PROCEDURE CONTENTS AMENDMENT SHEET Emirates Industrial Laboratory Revision: 03 PROCEDURE NO: OPN 036 Issue Date:  Jan.2004 TITLE: RADIOGRAPHY SAFETY PROCEDURE. Page 4 of 7 1         SCOPE 1.1  This procedure covers the requirements of Radiation Safety of personnel employed by Emirates Industrial Laboratory (EIL) and non-occupational personnel in the area during

SAFETY PROCEDURE RADIOGRAPHY SAFETY PROCEDURE Read Post »

Fire Rating

METHOD STATEMENT FOR INSTALLATION OF FIRE PROTECTION SERVICES

METHOD STATEMENT FOR INSTALLATION OF FIRE PROTECTION SERVICES TABLE OF CONTENTSContents Page1.0 OBJECTIVE 12.0 SCOPE3.0 HANGLING AND STORAGE4.0 WORK METHODLOGY4.1 Rigid Coupling4.2 Mechanical T Installation4.3 Flexible Coupling Installation4.4 Drop In Anchor Installation4.5 Pipe Hanger Installation4.6 Flanged Fittings Installation4.7 Valve with Screw Connection Installation4.8 Valve with Flanged End Connection Installation4.9 Flow Switch Installation4.10 Screw Fittings Installation4.11

METHOD STATEMENT FOR INSTALLATION OF FIRE PROTECTION SERVICES Read Post »