Delay in releasing Advance Payment; Withholding Tax

Our Ref: xxx Date: xxx To                    :           xxx Mideast                                    Oman Branch Attention          :           Mr. xxx Sing Project             :           xxx Building, Oman Subject                 : Delay in releasing Advance Payment; Withholding Tax Dear Sir, We refer to our letter Ref. xxx dated 29th June xxxx and previous discussion with you on the subject. Xxxx has made its position […]

Ongoing comments and changes on the Design

Our Ref: xxx Date: xxx To                    :           xxx Mideast                                    Oman Branch Attention          :           Mr. xxx Sing Project             :           xxx Building, Oman Subject                 : Ongoing comments and changes on the Design Dear Sir, Referring to your letter reply xxx (Attach. 001) and referring to the email from Mr. xxxx (Attach. 002), and referring to the comments on […]

Action Plan – Long Lead Items (Final order)

Our Ref: xxx Date: xxx To                    :           xxx Mideast                                    Oman Branch Attention          :           Mr. xxx Sing Project             :           xxx Building, Oman Subject                 : Action Plan – Long Lead Items (Final order) Our references Dear Sir, We refer to our above correspondence (ref: a to f) and numerous communications related to approval of long lead items. Please […]

Work Progress and Action Plan

Our Ref: xxx Date: xxx To                    :           xxx Mideast                                    Oman Branch Attention          :           Mr. xxx Sing Project             :           xxx Building, Oman Subject                 : Work Progress and Action Plan Our references Dear Sir, Following the meeting held on the 7th of June xxxx along with the consultant and the client, and the clear intention shown from the […]

Work Progress and Action Plan

Our Ref: xxx Date: xxx To                    :           xxx Mideast                                    Oman Branch Attention          :           Mr. xxx Sing Project             :           xxx Building, Oman Subject                 : Work Progress and Action Plan Our references Dear Mr. Prince, I’m writing to you to finalize all the pending engineering matters (drawings and materials) once for all, in order to move forward as […]

Undertaking Letter for the MS Ceiling Frame

Our Ref: xxx Date: xxx To                    :           xxx Mideast                                    Oman Branch Attention          :           Mr. xxx Sing Project             :           xxx Building, Oman Subject            :           Undertaking Letter for the MS Ceiling Frame        To whom so ever it may concern, Xxx fabricate all the steel frames within our facility as per the design requirement incorporating the access […]

Failure to deliver Materials as per the project requirement.

Our Ref: xxx Date: xxx To                           : xxx Construction Engg. Corp. (Middle East) LLC                                   P. O. Box xxx   Dubai, U.A.E. Attention            : Mr. xxx Project                 : xxx – Zabeeel Second, Dubai, UAE. Subject                 : Failure to deliver Materials as per the project requirement. Dear Sir You have failed till date to replace the rejected slabs for the […]

Re – Subcontractor’s default – Unavailable Manpower to attend snagging, DE snagging

Our Ref: xxx Date: xxx To                           : xxx Construction Engg. Corp. (Middle East) LLC                                   P. O. Box xxx   Dubai, U.A.E. Attention            : Mr. xxx Project                 : xxx – Zabeeel Second, Dubai, UAE. Subject:                Re – Subcontractor’s default – Unavailable Manpower to attend snagging, DE snagging, PQA & CHO works @ Tower-1, 2 & 3. References: a) […]

RE – Operation and Maintenance Manual & Training Manual

Our Ref: xxx Date: xxx To                           : xxx Construction Engg. Corp. (Middle East) LLC                                   P. O. Box xxx   Dubai, U.A.E. Attention            : Mr. xxx Project                 : xxx – Zabeeel Second, Dubai, UAE. Subject:                RE – Operation and Maintenance Manual & Training Manual Dear Sir, We are in receipt of your letter ref: xxx dated 8 June […]

Reply: – Notice of Delay Switch Relocation, Access Panel Provision and Light Fitting

Our Ref: xxx Date: xxx To                           : xxx Construction Engg. Corp. (Middle East) LLC                                   P. O. Box xxx   Dubai, U.A.E. Attention            : Mr. xxx Project                 : xxx – Zabeeel Second, Dubai, UAE. Subject:                Reply: – Notice of Delay Switch Relocation, Access Panel Provision and Light Fitting Installation References:        a) xxx dated 21 January xxxx b) […]