Method of Statement

GRP water tank

METHOD OF STATEMENT FOR WATER TANK INSTALLATION

METHOD OF STATEMENT FOR WATER TANK INSTALLATION 1.       Summary:    This section includes the following:- Approve Materials: Excavation Compaction Lean Concrete Backfilling 2.       Approved Material: Underground Fiber Glass Water Tank (Capacity 13,000 Lts) 4.51m x 2.00m 2.44m x 3.12m 2.44m x 3.12m 2.44m x 3.12m Sandfilling Material 3.       Excavation:            Excavate the area as per […]

METHOD OF STATEMENT FOR WATER TANK INSTALLATION Read Post »

METHOD STATEMENT FOR ELECTRICAL GALVANIZED CONDUITS INSTALLATION

METHOD STATEMENT FOR UNDERGROUND WATER PIPE LINE INSTALLATION

METHOD STATEMENT FOR UNDERGROUND WATER PIPE LINE INSTALLATION DRAWINGS : Follow approved water supply drawings. MATERIALS :a.) Approved PVC schedule 80 pipes and fittings for water lines.b.) Fine sand for sand bedding. Method of Installations:a.) Prepare approved drawings for water lines and significant materials and tools for pipe installation.b.) Excavate trenches up to required level

METHOD STATEMENT FOR UNDERGROUND WATER PIPE LINE INSTALLATION Read Post »

METHOD STATEMENT FOR ELECTRICAL GALVANIZED CONDUITS INSTALLATION

METHOD OF STATEMENT FOR WATER SUPPLY PIPE INSTALLATION INSIDE THE TOILET

METHOD OF STATEMENT FOR WATER SUPPLY PIPE INSTALLATION INSIDE THE TOILET Open an approved toilet detail shop drawing. This drawing should be accompanied with the approved location of mechanical pipe sleeves for both A/C indoor unit refrigeration tubes/pipes and sanitary fixtures ventilation. Installation of pipes should be done after the block work inside the toilet.

METHOD OF STATEMENT FOR WATER SUPPLY PIPE INSTALLATION INSIDE THE TOILET Read Post »

METHOD STATEMENT FOR MV CABLE PULLING AND INSTALLATION

METHOD OF STATEMENT OF UNDERGROUND PIPE INSTALLATION

METHOD OF STATEMENT OF UNDERGROUND PIPE INSTALLATION Material to be used:  NEPRO / PIPES: Approved (Trans # M-088) NAMAT-PVC FITTINGS: Approved (Trans # M-076) Summary:   This Method of Statement includes all the underground sewer                               pipe installation. 1. Procedure Excavate trenches to provide a clearance 300mm on each of the pipe. Bedding to be

METHOD OF STATEMENT OF UNDERGROUND PIPE INSTALLATION Read Post »

Vanity Counter

METHOD OF STATEMENT FOR PLUMBING FIXTURE INSTALLATION

METHOD OF STATEMENT FOR PLUMBING FIXTURE INSTALLATION Open an approved shop drawings. This shop drawing consist of approved toilet details and floor plans. Assemble plumbing fixtures and trim, fittings, faucets, and other components according to manufacturers’ written instructions, approved shop drawings, and referenced standards.For Water Closet:Secure approved material inspection request (MIR) for the WC.Recheck the

METHOD OF STATEMENT FOR PLUMBING FIXTURE INSTALLATION Read Post »

METHOD STATEMENT FOR ELECTRICAL GALVANIZED CONDUITS INSTALLATION

METHOD OF STATEMENT FOR DRAINAGE PIPE INSTALLATION INSIDE THE TOILET

METHOD OF STATEMENT FOR DRAINAGE PIPE INSTALLATION INSIDE THE TOILET Open an approved shop drawings. This shop drawings consist of approved Toilet details and mechanical pipe sleeves location for both indoor unit refrigeration pipes and sanitary fixtures ventilation. Block work (except the shaft walls) and water proofing activity should be done first before installation. Waiting

METHOD OF STATEMENT FOR DRAINAGE PIPE INSTALLATION INSIDE THE TOILET Read Post »

uPVC High Pressure Water Supply Piping System Installation Procedure

METHOD OF STATEMENT FOR MECHANICAL WORKS FOR SANITARY DRAINAGE

METHOD OF STATEMENT FOR MECHANICAL WORKS FOR SANITARY DRAINAGE Scope: This method of statement applies to mechanical works for sanitary drainage of buildings. Purpose: The basis of construction /installation for effective and qualified results Significant materials needed: Approved shop drawing (At site) PVC schedule 40 pipes and fittings (Trans.#         ) PVC Joining Compounds and cleaner

METHOD OF STATEMENT FOR MECHANICAL WORKS FOR SANITARY DRAINAGE Read Post »

Butterfly Valve Installation and Maintenance Procedure

METHOD OF STATEMENT FOR WATER SUPPLY PIPE INSTALLATION INSIDE THE TOILET

METHOD OF STATEMENT FOR WATER SUPPLY PIPE INSTALLATION INSIDE THE TOILET Open an approved toilet detail shop drawing. This drawing should be accompanied with the approved location of mechanical pipe sleeves for both A/C indoor unit refrigeration tubes/pipes and sanitary fixtures ventilation. Installation of pipes should be done after the block work inside the toilet.

METHOD OF STATEMENT FOR WATER SUPPLY PIPE INSTALLATION INSIDE THE TOILET Read Post »

uPVC High Pressure Water Supply Piping System Installation Procedure

METHOD OF STATEMENT OF UNDERGROUND PIPE INSTALLATION

METHOD OF STATEMENT OF UNDERGROUND PIPE INSTALLATION Summary:   This Method of Statement includes all the underground sewer                               pipe installation. 1. Procedure Excavate trenches to provide a clearance 200mm on each of the pipe. Bedding to be compacted in layers not exceeding 150mm to give uniform bed. Lay the pipe directly on the bedding.

METHOD OF STATEMENT OF UNDERGROUND PIPE INSTALLATION Read Post »