Method of Statement

Risk Assessment Procedure Step wise Guide

JOB HAZARD ANALYSIS Method Statement for Excavation and Foundation Preparation of Box Culvert

  TASK: ­­­­­­­­Excavation and foundation preparation of Box culvert     Date:15th July 2006 No ACTIVITY HAZARD RISK CONTROL MEASURES TO MINIMISE / ELIMINATE RISK RESPONSIBLE PERSON 1 Service location survey Manual handling operations (MHO’s) Work related upper limb disorders. Musculoskeletal injuries. Cuts, abrasions. Foot / toe injuries Maximum use of equipment to reduce need […]

JOB HAZARD ANALYSIS Method Statement for Excavation and Foundation Preparation of Box Culvert Read Post »

METHOD STATEMENT FOR MV CABLE PULLING AND INSTALLATION

Method Statement for Construction of cast-in-situ chambers (Wash out, air release, gate valve chamber, hydrant & water meter chamber)

CONTENTS Scope of Work Definitions References Subcontractors Materials Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments 1. Scope: 1.1 This Method Statement covers the construction of cast-in-situ chambers of the fire and water supply network intended for the wash out, air release valve, gate valve and hydrant elements. 2. Definitions: 2.1     MS: STM Method

Method Statement for Construction of cast-in-situ chambers (Wash out, air release, gate valve chamber, hydrant & water meter chamber) Read Post »

METHOD STATEMENT FOR MV CABLE PULLING AND INSTALLATION

Method Statement for Construction of Ducts for Fire & Water Supply Network

CONTENTS Scope of Work Definitions References Subcontractors Materials Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments  1. Scope: 1.1 This Method Statement covers the construction of ducts for fire and water supply network under taxiways, roads and wherever needed. 2. Definitions: 2.1     MS: STM Method Statement : Ducts for fire and water supply networks.

Method Statement for Construction of Ducts for Fire & Water Supply Network Read Post »

Rockwool panel

Method Statement for Erecting Sandwich Panels

CONTENTS Scope of Work Definitions References Subcontractors Materials Tools  & Equipment Safety Prior Activities Procedure Responsibilities Attachments 1. Scope: 1.1 This Method Statement covers the erection/installation of wall and roof sandwich panels for the temporary site offices of Parsons, Halcrow and OAJ.   2. Definitions: 2.1     CM: Construction Manager     2.2 SE: Site Engineer

Method Statement for Erecting Sandwich Panels Read Post »

Manhole-Excavation

Method Statement for Pipe Lines Installation
with Concrete Surround

CONTENTS Scope of Work Definitions References Subcontractors Materials Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments  1. Scope: 1.1 This Method Statement covers the laying and installation of GRP and u-PVC Pipes with Concrete encasement. 2. Definitions: 2.1     MS: STM Method Statement : Storm Water Drainage Work     2.2 ITR  Inspection and Test

Method Statement for Pipe Lines Installation
with Concrete Surround
Read Post »

Manhole-Excavation

Method Statement for Manhole Construction (Cast In Situ Stormwater Manholes)

CONTENTS Scope of Work Definitions References Subcontractors Materials Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments 1. Scope: 1.1 This Method Statement covers the cast in situ concrete storm water manholes, single and double catch pit Type (I), (II), and (III).   2. Definitions: 2.1     MS: Storm Water Drainage Method Statement     2.2

Method Statement for Manhole Construction (Cast In Situ Stormwater Manholes) Read Post »

METHOD STATEMENT FOR MV CABLE PULLING AND INSTALLATION

Method Statement for Future and Split Ducts

CONTENTS Purpose Scope of Work Definitions References Materials Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments 1.0    Purpose To ensure that future, split duct and related activities are executed safely and in          accordance with the contract requirements and that all quality assurance / control               activities are conducted in a systematic manner,

Method Statement for Future and Split Ducts Read Post »

Method Statement for Installation oof HDPE Piping

Method Statement for Installation of D.I pipes

CONTENTS Scope of Work Definitions References Subcontractors Materials Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments 1. Scope: 1.1 This Method Statement covers the installation of  D.I pipes. 2. Definitions: 2.1     MS: D.I Method Statement: ductile iron method statement.     2.2 ITR  Inspection And test Request     2.3 PPS   Particular Project Specification

Method Statement for Installation of D.I pipes Read Post »

Method Statement for Sub base and Gravel Base

Method Statement for GRP Pipes Laying with Granular Surround

CONTENTS Scope of Work Definitions References Subcontractors Materials Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments 1. Scope: 1.1 This Method Statement covers the laying of GRP Pipes with Granular surround. 2. Definitions: 2.1     MS: STM Method Statement : Storm Water Drainage Work     2.2 ITR  Inspection and Test Request     2.3

Method Statement for GRP Pipes Laying with Granular Surround Read Post »

Scroll to Top