Method of Statement

Shop Drawing

Method Statement for Production of As-Built Drawings

As-built drawings are the most important documents in the construction process.  As-built drawings are usually the original design drawings revised to reflect any changes made in the field (e.g., design changes issued by change order and/or RFI, component relocations required for coordination, and rerouting of distribution systems).  All of these revisions will need prior approval […]

Method Statement for Production of As-Built Drawings Read Post »

ACTIVITY HAZARD ANALYSIS Construction of Open Grouted Riprap Formed Channel

Method Statement for Construction of Open Grouted Riprap Formed

CONTENTS Purpose Scope of Work Definitions References Materials Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments Purpose 1.1       To ensure that the open grouted riprap formed channel is executed safely and in accordance with the contract requirements and that all quality assurance/ control activities are conducted in a systematic manner, works are inspected and

Method Statement for Construction of Open Grouted Riprap Formed Read Post »

ACTIVITY HAZARD ANALYSIS Construction of Open Concrete Formed Channel

Method Statement for Construction of Open Concrete Formed Channel

CONTENTS Purpose Scope of Work Definitions References Materials Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments Purpose 1.1       To ensure that the open concrete formed channel is executed safely and in accordance with the contract requirements and that all quality assurance/ control activities are conducted in a systematic manner, works are inspected and conformance

Method Statement for Construction of Open Concrete Formed Channel Read Post »

Method Statement for Sub base and Gravel Base

Method Statement for Placing Sub-Base and Gravel Base by Pavers

CONTENTS Purpose Scope of Work Definitions References Materials Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments 1.0    Purpose To ensure that placing of sub-base and gravel base by pavers, and related activities are executed safely and in accordance with the contract requirements and that all quality assurance / control activities are conducted in a

Method Statement for Placing Sub-Base and Gravel Base by Pavers Read Post »

METHOD STATEMENT FOR MV CABLE PULLING AND INSTALLATION

Method Statement for Casting of Blinding Concrete for Box Culvert and Installation of Precast Box Culvert Units

TABLE OF CONTENTS Purpose Scope of Work Definitions References Materials Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments 1. Purpose 1.1 To ensure that the Blinding of Box Culverts and Installation of Precast Box Culvert units are executed safely and in accordance with the contract requirements and that all quality assurance/ control activities are

Method Statement for Casting of Blinding Concrete for Box Culvert and Installation of Precast Box Culvert Units Read Post »

ACTIVITY HAZARD ANALYSIS PLACING OF SELECT FILL

METHOD STATEMENT FOR PLACING OF SELECT FILL

Table of Contents Purpose Scope of Work Definitions References Materials Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments 1.0       Purpose To ensure that placing of select fill material and related activities are executed safely and in accordance with the contract requirements and that all quality assurance / control activities are conducted in a systematic

METHOD STATEMENT FOR PLACING OF SELECT FILL Read Post »

METHOD STATEMENT FOR MV CABLE PULLING AND INSTALLATION

Method Statement for Construction of AGL Ducts and Installation of Precast AGL Lighting Pits

CONTENTS Scope of Work Definitions References Subcontractors Materials Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments Scope of Work This procedure is applicable to the following works associated with the project titled, “New 2k Runway- Main Runway Works” – Contract Number NRTW-1008-CN. This method statement outlines the procedures to be followed in the construction

Method Statement for Construction of AGL Ducts and Installation of Precast AGL Lighting Pits Read Post »

HDPE PIPE BUTT WELDING PROCEDURES

Method Statement for Protection of Existing Gas Pipelines Using Precast Concrete Slabs

CONTENTS Purpose Scope of Work Definitions References Materials Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments 1.0      Purpose To ensure that the protection of existing gas pipelines using precast concrete slabs, and related activities are executed safely and in accordance with the contract requirements and that all quality assurance / control activities are conducted

Method Statement for Protection of Existing Gas Pipelines Using Precast Concrete Slabs Read Post »

Method Statement for Sub base and Gravel Base

Method Statement for Excavation and Foundation Preparation of Box Culvert

Table of Contents Purpose Scope of Work Definitions References Materials Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments   1.0       Purpose To ensure that all excavation and foundation preparation of Box Culvert activities are executed safely and in accordance with the contract requirements and that all quality assurance / control activities are conducted in

Method Statement for Excavation and Foundation Preparation of Box Culvert Read Post »