Method of Statement

AAC BLOCK

ACTIVITY HAZARD ANALYSIS Block Works for Building

HAZARD / WORK: Block Works for Building LOCATION:______________________________________________ H=High                        M=Medium                   L=Low                                Significant Risks H M L   Who May Be Harmed 1 Work related upper limb disorders. Musculoskeletal injuries. Cuts, abrasions. Foot / toe injuries     X       2 Dehydration, heat exhaustion. Heat stroke     X   Employees…………………… X 3 Cuts, […]

ACTIVITY HAZARD ANALYSIS Block Works for Building Read Post »

ACTIVITY HAZARD ANALYSIS Construction of Open Concrete Formed Channel

Method Statement for Laying of 25mm Dia. AGL Duct in Existing Construction

CONTENTS Purpose Scope of Work Definitions References Materials Tools, Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments Purpose 1.1       To ensure that the laying of the 25mm diameter AGL duct is executed safely and in accordance with the contract requirements and that all quality assurance/ control activities are conducted in a systematic manner, works

Method Statement for Laying of 25mm Dia. AGL Duct in Existing Construction Read Post »

ACTIVITY HAZARD ANALYSIS Construction of Open Concrete Formed Channel

ACTIVITY HAZARD ANALYSIS Laying of 25mm Dia. AGL Duct in Existing Construction

HAZARD / WORK:       Laying of 25mm Dia. AGL Duct in Existing Construction LOCATION:______________________________________________ H=High                        M=Medium                   L=Low                                Significant Risks H M L   Who May Be Harmed 1 Work related upper limb disorders, musculoskeletal injuries, cuts, abrasions, and foot / toe injuries     X       2 Dehydration, heat exhaustion, heat stroke  

ACTIVITY HAZARD ANALYSIS Laying of 25mm Dia. AGL Duct in Existing Construction Read Post »

Compaction Trials of Bituminous Pavement Layers

Method Statement For Surface Friction Treatment Selection Trial (Base Case)

CONTENTS Purpose Scope of Work Definitions References Materials Tools, Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments Purpose 1.1       To ensure that the Surface Friction Treatment (SFT) Selection Trial (Base Case) is executed safely and in accordance with the contract requirements and that all quality assurance/ control activities are conducted in a systematic manner,

Method Statement For Surface Friction Treatment Selection Trial (Base Case) Read Post »

Compaction Trials of Bituminous Pavement Layers

Method Statement for Compaction Trials of Bituminous Pavement Layers

CONTENTS Purpose Scope of Work Definitions References Materials, Tools, Plant & Equipment Safety Prior Activities Procedure Responsibilities Attachments Purpose 1.1       To ensure that the compaction trials of the bituminous pavement layers is executed safely and in accordance with the contract requirements and that all quality assurance/ control activities are conducted in a systematic manner, works

Method Statement for Compaction Trials of Bituminous Pavement Layers Read Post »

Method Statement for Sub base and Gravel Base

Method Statement for Sub-Surface Deglottalization of Infrastructure

CONTENTS Purpose Scope of Work Definitions References Materials Tools, Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments Purpose 1.1       To ensure that the sub-surface delethalisation of all infrastructure within the graded portion of the runway strip that constitutes a buried upstand less than 400mm below ground level is executed safely and in accordance with

Method Statement for Sub-Surface Deglottalization of Infrastructure Read Post »

HDPE PIPE BUTT WELDING PROCEDURES

Method Statement for Grouting of Pipes in Stormwater Single and Double Pipe Catchpits

CONTENTS Purpose Scope of Work Definitions References Materials Tools, Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments Purpose 1.1       To ensure that the grouting of pipes in stormwater catchpits is executed safely and in accordance with the contract requirements and that all quality assurance/ control activities are conducted in a systematic manner, works are

Method Statement for Grouting of Pipes in Stormwater Single and Double Pipe Catchpits Read Post »

Method Statement For GRP LAMINATION

Method Statement For GRP LAMINATION

CONTENTS Purpose Scope of Work Definitions References Materials Tools, Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments Purpose 1.1       To ensure that the GRP lamination in sewage manhole and inspection chamber is executed safely and in accordance with the contract requirements and that all quality assurance/ control activities are conducted in a systematic manner,

Method Statement For GRP LAMINATION Read Post »