Method Statement Title: Flushing and Chemical Cleaning of Chilled Water Piping System – Supplementary
Method Statement Title: Flushing and Chemical Cleaning of Chilled Water Piping System – Supplementary SEQUENCE OF CHW SYSTEM FLUSHING
Method Statement Title: Flushing and Chemical Cleaning of Chilled Water Piping System – Supplementary SEQUENCE OF CHW SYSTEM FLUSHING
Method Statement Title: Flushing and Chemical Cleaning of Chilled Water Piping System 1.0 Scope : The scope of this method statement is to define the procedure for Flushing and chemical cleaning of chilled water piping system. Note 2.0 Material : 2.2 Chilled water piping system. 2.3 Circulation pumps. 3.0 Preparation
Method Statement Title: Flushing and Chemical Cleaning of Chilled Water Piping System Read Post »
Method of Statement for Air and water Balancing SECTION 1 1. GENERAL REQUIREMENTS XXX Technologies, as Independent Testing & Commissioning agency will perform the Testing, Balancing and Adjusting of the HVAC System in compliance with the specified tolerance and limitations outlined with CIBSE & BSRIA standards, guidelines and with reference to project specification. Before commencement
Method of Statement for Air and water Balancing Read Post »
Method Statement Title: Testing and Commissioning of VFD’s. 1.0 Scope 1.1 This method statement details the Testing and Commissioning of VFD’s according to the specification section 15725. Note: A separate method statement is submitted for installation of MCC’s and VFD’s. (Ref. ETA /MS/E-012) 2.0 Material 3.0 Applicable Location 3.1 VFD’s at East & West Podium
Method Statement Title: Testing and Commissioning of VFD’s. Read Post »
Method Statement Title: Testing and Commissioning of LV Switch boards / Panels. 1.0 Scope 1.1 This method statement details the Testing and Commissioning of LV Switch boards / Panels according to the specification section 16402. Note : A separate method statement is submitted for installation of L.V. Switch boards / Panels. ( Ref.
Method Statement Title: Testing and Commissioning of LV Switch boards / Panels. Read Post »
Method Statement Title: Testing and Commissioning of Light fixtures. 1.0 Scope 1.1 This method statement details the Testing and Commissioning of Light fixtures according to the specification section 16505. Note: A separate method statement is submitted for installation of Light fixture. (Ref. ETA /MS/E-023) 2.0 Material 3.0 Applicable Location 4.0 Instruments. 4.1 Insulation
Method Statement Title: Testing and Commissioning of Light fixtures. Read Post »
Method Statement Title: Testing and Commissioning of Final Distribution Boards. 1.0 Scope 1.1 This method statement details the Testing and Commissioning of Final Distribution board (DBs) according to the specification section 16415. 2.0 Material 3.0 Applicable Location 4.0 Instruments. 4.1 Insulation tester. 4.2 ELCB tester. 4.4 Multimeter. Note : The instruments used for testing and
Method Statement Title: Testing and Commissioning of Final Distribution Boards. Read Post »
Method Statement Title: Testing and Commissioning of Bus Duct System 1.0 Scope 1.1 This method statement details the Testing and Commissioning of Bus Duct System in accordance to the specification section 16450. 2.0 Material 3.0 Applicable Location 4.0 Instruments. Note : The instruments used for testing and commissioning shall be checked and ensured that they
Method Statement Title: Testing and Commissioning of Bus Duct System Read Post »
Method Statement Title: Testing and Commissioning of Isolators & Switching accessories 1.0 Scope 1.1 This method statement details the Testing and Commissioning of Isolators and Switching accessories according to the specification section 16415. 2.0 Material 3.0 Applicable Location 4.0 Instruments. 4.1 Insulation tester. 4.2 Multimeter ( Continuity test) Note : The instruments used for testing
Method Statement Title: Testing and Commissioning of Isolators & Switching accessories Read Post »
Method Statement Title: Testing and Commissioning of Generator and ATS 1.0 Scope 1.1 This method statement details the Testing and Commissioning of Generator and ATS according to the specification section 16402. Note: A separate method statement is submitted for installation of Generator and ATS. (Ref. ETA /MS/E-022) 2.0 Material 3.0 Applicable Location 4.0 Instruments. Note
Method Statement Title: Testing and Commissioning of Generator and ATS Read Post »