Method of Statement of wet area waterproofing works with step by step details and procedure.

Method of Statement of wet area waterproofing works with step by step details and procedure.

The method statement for wet area waterproofing works includes the following steps:

  1. Preparation: Before starting the waterproofing work, the site should be cleared and the subfloor prepared. The necessary materials, tools, and equipment should be on site.
  2. Surface Preparation: The surface to be waterproofed should be cleaned and made smooth to ensure a proper bond between the surface and the waterproofing material. Any cracks or gaps should be filled and the surface should be checked for level.
  3. Priming: A primer should be applied to the surface to ensure a proper bond between the surface and the waterproofing material.
  4. Applying the Waterproofing Material: The waterproofing material should be applied to the surface, ensuring that it is spread evenly and that any air pockets are removed. The material should be allowed to cure for the specified time.
  5. Testing the Waterproofing: The waterproofing should be tested by applying water to the surface and checking for any leaks. Any leaks should be repaired.
  6. Finishing: The surface of the waterproofing should be finished to achieve the desired surface finish.
  7. Inspection: After the waterproofing work is complete, the surface should be inspected to ensure that it meets the specified requirements and that there are no defects.

It is important to follow these steps carefully and in the correct order to ensure the proper application of the waterproofing material in the wet area. It is also recommended to have a competent person supervise the waterproofing work and to ensure that all workers follow proper safety procedures.