Method of Statement of Block works with step by step details and procedure.

Method of Statement of Block works with step by step details and procedure.

The method statement for block work construction includes the following steps:

  1. Preparation: Before starting the block work, the foundation and floor slab should be prepared and inspected to ensure that they are level and suitable for construction. All necessary materials, tools, and equipment should be on site.
  2. Laying out the Blocks: The blocks should be laid out on the floor slab to ensure that the pattern is correct and that the blocks fit together properly. The blocks should be laid with mortar in between the joints.
  3. Laying the First Course: The first course of blocks should be laid, starting from one corner and working towards the other. The blocks should be laid with mortar in between the joints, and the joints should be filled to the top.
  4. Setting the Blocks: The blocks should be set in place, ensuring that they are level and straight. A spirit level should be used to check the level and to ensure that the blocks are aligned.
  5. Laying the Next Course: The next course of blocks should be laid, starting from the opposite corner and working towards the first corner. The blocks should be laid with mortar in between the joints, and the joints should be filled to the top.
  6. Repeating the Laying and Setting Process: The laying and setting process should be repeated for each subsequent course, ensuring that the blocks are level and aligned and that the joints are filled with mortar.
  7. Finishing: The block work should be finished by filling any gaps or voids in the joints and by smoothing the surface of the mortar.
  8. Inspection: After the block work is complete, it should be inspected to ensure that it meets the specified requirements and that there are no defects.

It is important to follow these steps carefully and in the correct order to ensure the proper construction of the block work. It is also recommended to have a competent person supervise the block work construction and to ensure that all workers follow proper safety procedures.