Mandatory Checklist for Anchored Retaining Wall Foundation Design.

Mandatory Checklist for Anchored Retaining Wall Foundation Design.

Designing the foundation for an anchored retaining wall involves considerations for stability, bearing capacity, and soil-structure interaction. Below is a detailed checklist with explanations and examples for the design of an anchored retaining wall foundation:

1. Site Investigation:

  • Explanation: Conduct a thorough site investigation to understand soil conditions.
  • Example: Perform soil tests (SPT, CPT) to determine soil properties, bearing capacity, and potential sliding or settlement.

2. Load Analysis:

  • Explanation: Analyze and calculate loads acting on the anchored retaining wall.
  • Example: Consider the weight of the wall, backfill soil pressure, surcharge loads, water pressure, and seismic loads to determine the total lateral load.

3. Bearing Capacity:

  • Explanation: Ensure that the soil bearing capacity is sufficient for the applied loads.
  • Example: If the total lateral load is 180 kN/m and the soil bearing capacity is 250 kN/m², the foundation is considered suitable.

4. Sliding Stability:

  • Explanation: Check and ensure the foundation resists sliding.
  • Example: Calculate the sliding force and compare it to the resisting force provided by the foundation. Use appropriate safety factors.

5. Overturning Stability:

  • Explanation: Verify the foundation’s resistance to overturning.
  • Example: Assess the moments and forces acting on the anchored wall and ensure they are counteracted by the resisting moments and forces provided by the foundation.

6. Foundation Geometry:

  • Explanation: Determine the appropriate dimensions and shape of the foundation.
  • Example: Design a trapezoidal or rectangular foundation with dimensions that distribute the loads evenly along the length of the anchored wall.

7. Reinforcement:

  • Explanation: Specify reinforcement in the foundation, if required.
  • Example: Include reinforcing bars in the foundation to enhance its tensile strength and improve overall stability.

8. Foundation Depth:

  • Explanation: Determine the optimal foundation depth for stability.
  • Example: Increase the foundation depth if weak or compressible soil layers are present near the surface.

9. Toe and Heel Details:

  • Explanation: Address toe and heel details to enhance stability.
  • Example: Extend the foundation in the direction of potential sliding (toe) and provide a keying-in detail to resist sliding.

10. Drainage:

  • Explanation: Implement drainage measures to reduce hydrostatic pressure.
  • Example: Install drainage pipes behind the anchored wall to relieve water pressure and prevent water accumulation.

11. Backfill Compaction:

  • Explanation: Specify compaction requirements for the backfill soil.
  • Example: Compaction should be done in lifts with specified moisture content to achieve adequate density.

12. Anchor Connection:

  • Explanation: Detail the connection between the foundation and anchors.
  • Example: Ensure that the anchors are securely attached to the foundation using appropriate connectors.

13. Anchor Design:

  • Explanation: Design the anchors to resist tensile forces.
  • Example: Calculate the required anchor length and embedment depth based on the wall geometry, soil properties, and applied loads.

14. Construction Sequence:

  • Explanation: Develop a construction sequence that ensures stability during and after construction.
  • Example: Excavate, place and compact the foundation material, construct the anchored wall, and ensure proper compaction of the backfill.

15. Quality Control:

  • Explanation: Implement quality control measures during construction.
  • Example: Monitor the compaction of backfill, check reinforcement placement, and verify the dimensions of the foundation.

16. Code Compliance:

  • Explanation: Ensure compliance with local building codes and standards.
  • Example: Adhere to relevant codes such as AASHTO LRFD Bridge Design Specifications or local geotechnical standards.

17. Professional Engineer Involvement:

  • Explanation: Engage a qualified geotechnical and structural engineer to oversee the design.
  • Example: Have licensed engineers review and approve the anchored retaining wall foundation design to ensure it meets safety and code requirements.

18. Record Keeping:

  • Explanation: Maintain detailed records of the anchored retaining wall foundation design process.
  • Example: Document all design calculations, soil test results, construction activities, and as-built drawings for future reference and audits.

By following this checklist, engineers can ensure a well-designed anchored retaining wall foundation that effectively resists lateral loads, provides stability, and minimizes potential failure modes.